My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Citywide Sidewalk Replacement Program Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
Item 11 - Citywide Sidewalk Replacement Program Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 5:05:48 PM
Creation date
8/21/2023 5:05:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
4/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
View images
View plain text
Public Works Agency <br />https://www.santa-ana.org/pw <br />Item # 11 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br />April 20, 2021 <br />TOPIC: Citywide Sidewalk Replacement Program Update <br />AGENDA TITLE <br />Receive and File Citywide Sidewalk Replacement Program Update <br />RECOMMENDED ACTION <br />Receive and file citywide Sidewalk Replacement Program update. <br />DISCUSSION <br />The Public Works Agency’s Maintenance Services Division assumed responsibility of the <br />Sidewalk Replacement Program in 2020, which oversees 800 miles of sidewalks (Exhibit <br />1). Staff evaluates sidewalks, curbs, and gutters to identify uneven surfaces that may <br />pose a risk to pedestrians. The goal is to improve safety, increase active modes of <br />transportation such as walking and biking, and comply with regulations set forth by the <br />American with Disabilities Act to reduce the potential for liability claims. <br />For Fiscal Year 2020-21, the City Council approved $1 million of General Fund monies <br />for dedicated sidewalk replacement. Staff surveyed reported areas with the highest need <br />and concentration of locations and developed a multi-phased plan to improve the <br />sidewalk conditions. Beginning in July 2020, the City has worked at an accelerated pace <br />and has replaced concrete at 1,061 sidewalk locations (approximately 90,000 square <br />feet), 2,957 linear feet of curb and gutter, and 2,430 linear feet of curb ramps in 12 <br />neighborhoods throughout all six City Council wards (Exhibit 2). <br />Work began on June 30, 2020 in the Heninger and French Park neighborhoods when the <br />City Manager authorized the award of a contract to EBS General Engineering Services <br />Inc. utilizing $200,000 of Special Gas Tax funds. <br />On October 6, 2020, the City Council authorized $600,000 to perform sidewalk <br />replacement in other areas of the City, including North Windsor Park, Windsor Park, West <br />Grove Valley, Thornton Park, Fairbridge Square, and Park Santiago neighborhoods; work <br />was completed in December 2020. <br />On January 19, 2021, the City Council authorized the use of the remaining funds totaling <br />$600,000 to deliver additional sidewalk concrete improvements in the Windsor Village,
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).