Laserfiche WebLink
PacificElectricBikeTrail –Phase2,SandpointePark <br />RFPNo.20-129 <br /> Page2 <br />Pacific Electric Bike Trail Phase II <br />Task Total Team Hours Fee <br />Preliminary Engineering 72 $9,624 <br />Design Development 117 $13,827 <br />Construction Documents 128 $15,521 <br />Bid Advertisement, Construction Administration, Record Drawings 36 $4,663 <br />Reimbursables $2,400 <br />Totals 353 $46,035 <br />Sandpoint Park <br />Task Total Team Hours Fee <br />Preliminary Engineering 21 $2,666 <br />Design Development 51 $5,728 <br />Construction Documents 53 $6,321 <br />Bid Advertisement, Construction Administration, Record Drawings 16 $1,901 <br />Reimbursables $2,400 <br />Totals 141 $19,016