My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Design and Construction Services for the 17th Street Triangle Park Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
Item 23 - Design and Construction Services for the 17th Street Triangle Park Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:41:12 PM
Creation date
8/21/2023 5:10:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
4/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARSIN GOVARGEZ <br />P.E. <br />PRINCIPAL IN CHARGE <br />15% <br />STATEMENT OF QUALIFICATIONS <br />ORGANIZATIONAL CHART <br />DESIGN TEAM <br />v <br />BRYAN STARR <br />P.E., S.E., LEED AP BD+C <br />LEAD STRUCTURAL <br />ENGINEER <br />25% <br />JAMES BRECK <br />ELECTRICAL <br />ENGINEER <br />Linwood Engineering <br />25% <br />r F <br />MICHAEL LEDBETTER <br />RLA,ASLA <br />LANDSCAPE <br />ARCHITECT <br />30% <br />1 �1` <br />SANTIAGO CRESPO <br />ENVIRONMENTAL <br />GRAPHICS <br />Little <br />5% <br />CONSULTANTS <br />Irerracan <br />GEOTECHNICAL <br />ENGINEERING <br />$ CITY OF SANTA ANA: RFP NO: 20-130 <br />171H STREET TRIANGULAR PARK RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.