My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Design and Construction Services for the 17th Street Triangle Park Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
Item 23 - Design and Construction Services for the 17th Street Triangle Park Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:41:12 PM
Creation date
8/21/2023 5:10:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
4/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />REFERENCES <br />IRVINE VALLEY COLLEGE: B-QUAD IMPROVEMENTS + <br />ADA UPGRADES <br />Irvine Valley College (IVC) is committed to making their campus more accessible and have allocated <br />funds every year to continue to make those types of improvements to their campus. <br />Our Land Development Studio was awarded the project in the fall of 2019 and the scope included site <br />improvements for (3) separate portions of the campus where barriers to accessibility such as uplifting <br />panels and non -compliant slopes along an accessible path -of -travel needed to be addressed. <br />The main focus of the project became the B-quad. This was an existing plaza area set between (4) <br />different educational buildings and comprised of multiple raised planters and a small central gathering <br />space. The original scope only included fixing a number of small areas within the quad but after walking it <br />with the college they decided to pursue a more holistic change that would address the accessibility issues <br />but also re -imagine the space, take advantage of the quad's size and capitalize on its location within the <br />campus. We prepared a couple of schematic designs and after the college selected their preferred layout <br />we prepared ROM pricing to make sure it would still work within the project's budget. The final design will <br />open up the space, improve pedestrian circulation making it more visually accessible upon approach and <br />from the various seating areas within the space. <br />Little worked with D. Woolley & Associates on this project as they provided all ground survey and digital <br />mapping for the District. <br />eaoa <br />CLA,SSRDDMS <br />D LAN <br />ae '] <br />L - I L <br />• � i +l y l i i <br />• 1 4 1 1 <br />�ma <br />CLASSROOMS. DFFICES, <br />8 EIDOCSTORE <br />i_t v i L L s 1- <br />i <br />JT 4 <br />r <br />- �LvA <br />r: A I <br />wo <br />MADMATICS <br />B RIf4SKAL <br />SCIENCES <br />22 <br />CITY OF SANTA ANA: RFP NO: 20-130 <br />171H STREET TRIANGULAR PARK RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.