My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/06/2021 Regular
>
Item 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:49:49 PM
Creation date
8/21/2023 5:15:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
4/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-6802 <br />LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK <br />ATPL-5063(177) <br />Item Description <br />I <br />Qty <br />Unit Unit Price <br />Amount <br />i <br />13 Relocate I.andscape <br />1 <br />LS <br />2.500.00 <br />'� <br />2,500.00 <br />Boulders <br />l4 <br />Remove Residential <br />60 <br />1.1: + <br />5 <br />Screen Wall (Includes <br />30.00 <br />1,800.00 <br />Gates and Fencing) <br />15 <br />Fine Grading <br />3o.550 <br />"'F r <br />1.00 <br />1 <br />30,550.00 <br />16 <br />Unclassified <br />713 <br />C Y �60.00 <br />42,780.00 <br />Excavation and Ftll <br />� <br />St ith Excavated <br />Material <br />17 <br />Unclassified <br />790 <br />CY <br />�1.00 <br />40,290.00 <br />Excavation and I.xlx,rt <br />ofLxca%ated Material <br />_---I <br />18 <br />Construct <br />9•5,5 <br />SF 10.00 <br />95,650.00 <br />Decomposed Granite <br />Path1%a% %%ith Organic <br />Binder (includes <br />1 <br />Aggregate Base t <br />19 <br />Construct <br />730 <br />LF �20.00 <br />14,600.00 <br />Decomlxwed Granite <br />Pavement Concrete <br />Header (Include,., <br />i <br />A re ate Ba,Y: t <br />20 <br />Construct Colored <br />780 <br />5F <br />20.00 <br />$ <br />15,600.00 <br />Concrete Ila%ement <br />(includes Aggregate <br />[iaset <br />-- <br />21 <br />Construct Asphalt <br />151 <br />SF <br />140.00 <br />6,040.00 <br />Concrete I'av�nent <br />(Includes Aggregate <br />Bast: <br />22 <br />Construct Concrete <br />1 1 j %5.00 <br />"4,875.00 I <br />Curb (include-, <br />j <br />Aggregate Base- 1 <br />23 <br />Construct Conctnte <br />��ti <br />I 1 <br />52,200.00 <br />Curb and Clutter <br />(Includes Aggregate <br />Banc) <br />24 <br />Constrict Concrete <br />100.00 <br />i <br />8,500.00 <br />j <br />Cn,sa Gutter <br />23 <br />Construct Concrete <br />1 1 '45.00 <br />6,695.00 <br />Retaining Curb <br />26 <br />Install Detectable <br />O` <br />til <br />4,500.00 <br />Warning Surface100.00 <br />P of P <br />
The URL can be used to link to this page
Your browser does not support the video tag.