My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 25 - Warner Avenue Protected Bike Lanes ( Grand Avenue to Oak Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 5:00:11 PM
Creation date
8/21/2023 5:25:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One such solution used in the North Park I Mid -City Bikeways and Imperial Avenue Bikeway is a <br />bendout—an intersection improvement that provides lateral separation between bicyclists and vehicular <br />traffic, creating more space and time to react at potential conflict points. A bend -out provides similar <br />benefits to a protected intersection but can be implemented at smaller intersections and minimizes the <br />improvement footprint. The design also improves the visibility of people walking and biking, shortens <br />crossing distances, and encourages slow vehicle turning speeds. <br />Year Completed: Ongoing I Client Name: SANDAG I Contact: Linda Culp, Phone:.619.699.6957 <br />Similarities to the City's Project: <br />Protected bikeway design <br />./ Bus stop treatment <br />./ Transit coordination <br />./ Intersection reconfiguration <br />f. References <br />As trusted advisors, our firm works diligently on behalf of our clients' needs. We encourage you to <br />contact the clients below, as well as those listed in Section 1.e regarding our team's work history and <br />quality of service. <br />Ellie Yazdani <br />City of Anaheim <br />200 S. Anaheim Boulevard, Suite 276, Anaheim, CA 92805 <br />714.765.4530 1 eyazdani@anaheim.net <br />Project: Gene Autry Way Improvements <br />Curtis Castle <br />City of Santa Monica <br />1685 Main Street, Santa Monica, CA 90401 <br />310.458.8234 1 curtis.castle@smgov.net <br />Project: Lincoln Neighborhood Corridor Plan (LiNC) and On -Call Civil Engineering Design Consulting <br />Services and Preparation of Temporary Traffic Control Plans <br />Keith Kramer <br />City of Fontana <br />8353 Sierra Avenue, Fontana, CA 92335 <br />909.350.6644 1 kkramer@fontana.org <br />On -Call Pavement Rehabilitation/Utility Design <br />Kathy Nguyen <br />City of Laguna Niguel <br />30111 Crown Valley Parkway, Laguna Niguel, CA 92677 <br />949.362.4341 1 kanguyen@cityoflagunaniguel.org <br />Project: On -Call Engineering Services — Various Tasks <br />City of Santa Ana TRRD77006.2020 18 Kimley>>) Horn <br />
The URL can be used to link to this page
Your browser does not support the video tag.