My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Solutions for Congested Corridors Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/02/2021 Regular
>
Item 22 - Solutions for Congested Corridors Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 1:48:24 PM
Creation date
8/22/2023 7:47:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
3/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Santa Clara Bicycle and Pedestrian Improvements - $3.243 million <br />• Bus Stop Improvements on Routes 53/553 (Bravo! Main Street) - $0.344 million <br />The total SCCP program award remains the same. <br />Technical Changes <br />Bravol Main Street— Five Zero -Emission Buses <br />• Change from hydrogen fuel -cell to battery electric. With the changes in the State mandates, OCTA <br />needs to accelerate testing between zero -emission technologies. There is no impact to benefits <br />as battery -electric buses are still zero -emission. <br />Project Programming Requests Updates <br />Warner Avenue Signal Synchronization - $4.092 million <br />• Updates to schedule to match allocation, contract award, and actual CEQA filing. <br />• Updates to the Project Manager/Contacts. Original Project Manager retired. <br />• Add "Design -Build" in scope. This project was approved as a design build in the application. <br />Edinger Avenue Signal Synchronization - $4.957 million. <br />• Updates to schedule to match allocation, contract award, and actual CEQA filing. <br />• Updates to the Project Manager/Contacts. Original Project Manager retired. <br />• Add "Design -Build" in scope. This project was approved as a design build in the application. <br />MacArthur Boulevard/Talbert Avenue Signal Synchronization - $2.951 million <br />• Updates to schedule to match allocation, contract award, and actual CEQA filing. <br />• Updates to the Project Manager/Contacts. Original Project Manager retired. <br />• Add "Design -Build" in scope. This project was approved as a design build in the application. <br />Bravo! Main Street— Five Zero -Emission Buses - $4.330 million <br />• Updates to scope from Hydrogen Fuel -Cell to Battery -Electric. <br />• Updates schedule to advance project. <br />• No changes to benefits as both fuel types are zero -emission. <br />Add the following Project Programming Requests <br />• Santa Clara Bicycle and Pedestrian Improvements - $3.243 million <br />• Bus Stop Improvements on Routes 53/553 (Bravo! Main Street)- $0.344 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.