Laserfiche WebLink
WRIGHT ST <br />I <br />WRIGHT ST <br />PROPOSED - <br />BIKEWAY <br />- <br />MANTLE ST <br />PROPOSED BULB -OUTS <br />BULB -OUTS <br />SANTA CLARA AVE - GRAND AVE TO LYON ST SANTA CLARA AVE - GRAND AVE TO LYON ST <br />EXISTING CONDITIONS PROPOSED CONDITIONS <br />4� <br />r <br />8'-12' 8' w 12' 18' 8' 8'-12' <br />31DEWALK PARKNG DRIVE LANE CNN R DRIVE LANE PARKING SIDEWALK <br />LANE <br />REVISIONS <br />DESCRIPTION <br />PROPOSED <br />SIDEWALK <br />SANTA CLARA AVE - LYON ST TO TUSTIN <br />EXISTING CONDITIONS <br />8' 14' V, 16' 8' 8' <br />SIDEWALK DRIVE LANE CENTER DRIVE LANE PARKING SIDEWALK <br />TURN <br />LANE <br />BENCHMARK NO, XX-XXX-XX <br />-w . <br />\ AVE <br />REFERENCES <br />RIDGEWOOD ST <br />ELEV.: NNN.NN' NAVDYY <br />..Mws <br />8 8 a Fu CEINTER 10 a 8 8 <br />SIDEWALK PARKING h y LANE TURN LANE 'v h PARKING SIDEWALK <br />m LANE m <br />PROPOSED 'i r <br />SIDEWALK PROPOSEL <br />SO: <br />BIKEWAY <br />7— <br />— <br />SANTA CLARA AVE <br />SANTA CLARA AVE - LYON ST TO TUSTIN <br />PROPOSED CONDITIONS <br />s: <br />aU. q• 10' 10' a 8' 8' <br />E DFM <br />y3 N DRIVER DRIVE n PARKING SIDEWALK <br />p m LANE TURN <br />LANE LANE m <br />u­_ PROPOSED PROJECT <br />07-01-18 SANTA CLARA AVENUE FROM <br />IGNED: MC/RC DRAWN: MC/RC CHECKED: ZK 07-01-18 <br />CMMENDE°° <br />]MMENDED FOR CONSTRUCTION: LINCOLN STREET TO TUSTIN AVENUE <br />07-01-18 PUBLIC WORKS AGENCY <br />CITY OF SANTA ANA <br />SHT-TA-Sant <br />- HVa 111.0 n /ILU/LUIE L:Ub:4L YM <br />