My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:01:23 PM
Creation date
8/22/2023 9:18:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Page 4 <br />South Main Street Corridor Improvements; South Main Rehabilitation; South Main Sewer Improvements (17-9001, 18-6911, 20- Printed 11/10/2020 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />36 <br />Adjust Storm Drain/Sewer Manhole to Grade <br />EA <br />32 <br />$909.07 <br />$29,090.24 <br />37 <br />Adjust Street Light Pullbox to Grade <br />EA <br />24 <br />$126.53 <br />$3,036.72 <br />38 <br />Adjust Traffic Signal Pullbox to Grade <br />EA <br />65 <br />$116.08 <br />$7,545.20 <br />39 <br />Adjust Exisiting Water Meter to Grade <br />EA <br />33 <br />$102.34 <br />$3,377.22 <br />40 <br />Adjust Exisiting Sewer Clean out to Grade <br />EA <br />1 <br />$742.91 <br />$742.91 <br />41 <br />Adjust Exisiting Surveying Monument Well to Grade <br />EA <br />5 <br />$812.57 <br />$4,062.85 <br />42 <br />Adjust Fire Alarm Pullbox to Grade <br />EA <br />3 <br />$464.33 <br />$1,392.99 <br />43 <br />Construct Monument Sign <br />EA <br />1 <br />$44,110.81 <br />$44,110.81 <br />44 <br />Construct Local Depression <br />SF <br />230 <br />$11.90 <br />$2,737.00 <br />45 <br />Install Fire Hydrant Assembly and Service <br />EA <br />12 <br />$12,160.70 <br />$145,928.40 <br />46 <br />Install Water Meter Box, Water Meter and Valve <br />EA <br />8 <br />$7,109.10 <br />$56,872.80 <br />47 <br />Construct Parkway Culvert Type B <br />EA <br />21 <br />$1,501.30 <br />$31,527.30 <br />48 <br />Construct Parkway Drain <br />EA <br />6 <br />$7,661.35 <br />$45,968.10 <br />49 <br />Relocate Existing Water Valve <br />EA <br />1 <br />$559.29 <br />$559.29 <br />50 <br />Relocate Traffic Signal Pullbox <br />EA <br />2 <br />$1,174.74 <br />$2,349.48 <br />51 <br />DELETED ITEM PER ADDENDUM 4 <br />0 <br />0 <br />0 <br />0 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.