My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:01:23 PM
Creation date
8/22/2023 9:18:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 6 <br />South Main Street Corridor Improvements; South Main Rehabilitation; South Main Sewer <br />Improvements (17-9001, 18-6911, 20- Printed 11/10/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />68 <br />10" HDPE Sewer Main <br />L F <br />300 <br />$441.11 <br />$132, 333.00 <br />69 <br />4" PVC SDR 26 Sewer Lateral (Including Cleanout, Connection to Existing Lateral, and Wye at Proposed Main) <br />EA <br />140 <br />$7,313.11 <br />$1,023,835.40 <br />70 <br />6" PVC SDR 26 Sewer Lateral (Including Cleanout, Connection to Existing Lateral, and Wye at Proposed Main <br />EA <br />1 <br />$8,125.67 <br />$8,125.67 <br />71 <br />Signing and Striping <br />LS <br />1 <br />$95,186.48 <br />$95,186.48 <br />72 <br />SWPP/NPDES/Erosion Control <br />LS <br />1 <br />$6,488.70 <br />$6,488.70 <br />73 <br />Construction Information Signs <br />EA <br />6 <br />$1,022.33 <br />$6,133.98 <br />74 <br />Traffic Signal Modification at Main St & St. Andrew PI <br />LS <br />1 <br />$164,405.61 <br />$164,405.61 <br />75 <br />Traffic Signal Modification at Main St & Pomona St <br />LS <br />1 <br />$51,789.56 <br />$51,789.56 <br />76 <br />Traffic Signal Modification at Main St & Chestnut Ave <br />LS <br />1 <br />$169,072.07 <br />$169,072.07 <br />77 <br />Video Detection System at Main St & St. Andrew PI <br />LS <br />1 <br />$38,295.14 <br />$38,295.14 <br />78 <br />Video Detection System at Main St & Chestnut Ave <br />LS <br />1 <br />$38,295.14 <br />$38,295.14 <br />79 <br />Install 2" PVC Conduit Per Plan <br />L F <br />440 <br />$20.53 <br />$9, 033.20 <br />80 <br />Install 4" PVC Conduit Per Plan <br />LF <br />570 <br />$75.82 <br />$43,217.40 <br />81 <br />Install No.6 Vandal Resistant Pull Box <br />EA <br />29 <br />$662.82 <br />$19,221.78 <br />82 <br />Pothole Traffic Signal Pole Location for Utility Conflicts <br />EA <br />15 <br />$927.49 <br />$13,912.35 <br />83 <br />Temporary Overhead Wiring at Main St & St. Andrew PI <br />LS <br />1 <br />$20,373.39 <br />$20,373.39 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.