My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:01:23 PM
Creation date
8/22/2023 9:18:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 8 <br />South Main Street Corridor Improvements; South Main Rehabilitation; South Main Sewer Improvements (17-9001, 18-6911, <br />20- Printed 11/10/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Qty Unit Price <br />Line Total Comment <br />99 <br />Street Lighting - Bid Alternative One (Edinger to Chestnut) <br />LS <br />1 $1,797,572.14 <br />$1,797,572.14 <br />100 <br />Street Lighting - Bid Alternative Two (Warner to St. Andrew) <br />LS <br />1 $798,936.04 <br />$798,936.04 <br />101 <br />Furnish and Install String Lighting and Lighting Support Pole <br />EA <br />47 $15,650.05 <br />$735,552.35 <br />102 <br />Install Decorative Traffic Sign Post <br />EA <br />44 $4,718.70 <br />$207,622.80 <br />103 <br />Paint Traffic Signal Pole and Push Button Pole <br />LS <br />1 $20,693.77 <br />$20,693.77 <br />104 <br />Install Decorative Traffic Signal Poles <br />LS <br />1 $391,536.78 <br />$391,536.78 <br />105 <br />Furnish and Install Bus Shelter Unit (12' Non AD Sunset Shelter) <br />EA <br />17 $9,842.84 <br />$167,328.28 <br />106 <br />Remove Existing Bus Shelter and Relocate to New Location <br />EA <br />17 $773.87 <br />$13,155.79 <br />Subtotal <br />$4,132,397.95 <br />Asterisk Notes (Per Section 3-2 of Standard Specifications) - NOT part of Base Bid Total Calculation <br />107 <br />* = The quantity for this bid item is shown for bid comparison only. This <br />bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the <br />Standard Specifications. This bid item shall not be subject to the "25%" <br />limit as stated in Section 3-2 of the Standard Specifications. The actual amount <br />for this item will be dictated by the actual quantitiy used, and the Agency reserves the right to increase or decrease the quantity of this item <br />accordingly. <br />ea <br />0 0 <br />0 <br />108 <br />t = This bid item is considered a Specialty Item per Section 2-3.2 of <br />the Standard Specifications. <br />ea <br />0 0 <br />0 <br />Subtotal <br />0 <br />Total <br />$13,151,231.98 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.