My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completion of the proposed Project. Near -term (Year 2025) cumulative daily and peak hour traffic <br />forecasts were projected by incorporating a one percent (1.0%) annual growth rate and the trip <br />generation potential of thirty (30) related projects. Long-term (Year 2040) daily and peak hour <br />traffic forecasts were projected based on modeled traffic projections prepared by OCTA utilizing the <br />OCTAM 4.0 Year 2040 Model. <br />1.2 Study Area <br />Based on a "50 trip threshold" for analysis and collaboration with City staff, twenty-five (25) key <br />study intersections have been identified for evaluation. The twenty-five (25) intersections listed <br />below provide regional and local access to the study area and define the extent of the boundaries for <br />this traffic impact investigation. <br />Key Study Intersections <br />1. Elk Lane at First Street (Santa Ana) <br />2. I-5 SB On -Ramp at First Street <br />(Santa Ana/Caltrans) <br />3. Cabrillo Park Drive at First Street (Santa Ana) <br />4. Golden Circle Drive at First Street (Santa Ana) <br />5. Tustin Avenue at First Street (Tustin) <br />6. Yorba Street at First Street (Tustin) <br />7. I-5 SB On-Ramp/Mabury Street at 4a' Street <br />(Santa Ana/Caltrans) <br />8. I-5 NB Ramps at 41 Street (Santa Ana/Caltrans) <br />9. Cabrillo Park Drive at 41 Street (Santa Ana) <br />10. Golden Circle Drive at 4t' Street (Santa Ana) <br />11. Park Center Drive at 4t' Street (Santa Ana) <br />12. Tustin Avenue at 41 Street (Santa Ana) <br />13. SR-55 SB Ramps at 41 Street (Santa Ana/Caltrans) <br />14. SR-55 NB Ramps at 4t' Street (Tustin/Caltrans) <br />15. Yorba Street at 4« Street (Tustin) <br />16. Cabrillo Park Drive at State Fund Access Road (Santa Ana) <br />17. Cabrillo Park Drive at Xerox Center Access Road (Santa Ana) <br />18. Cabrillo Park Drive at 17« Street (Santa Ana) <br />19. Cabrillo Park Drive at Wellington Avenue (Santa Ana) <br />20. Tustin Avenue at Wellington Avenue (Santa Ana) <br />21. Mabury Street at Fruit Street (Santa Ana) <br />22. Cabrillo Park Drive at Fruit Street (Santa Ana) <br />23. Park Center Drive at Fruit Street (Santa Ana) <br />24. Tustin Avenue at Fruit Street (Santa Ana) <br />25. Cabrillo Park Drive at Park Court Place (Santa Ana) <br />Figure 1-1 presents a Vicinity Map, which illustrates the general location of the Project and depicts <br />the study locations and surrounding street system. The Level of Service (LOS) investigations at <br />these key locations were used to evaluate the potential traffic -related impacts associated with area <br />growth, cumulative projects and the proposed Project. When necessary, this report recommends <br />intersection and/or roadway improvements that may be required to accommodate future traffic <br />volumes and restore/maintain an acceptable Level of Service, and/or mitigates the impact of the <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.