Laserfiche WebLink
2.0 PROJECT DESCRIPTION <br />The Project site is an 8.35-acre vacant parcel of land within the Metro East Mixed Use Overlay Zone <br />that is generally located north of 4th Street, east of the Santa Ana (I-5) freeway, and west of Cabrillo <br />Park Drive. Figure 2-1 is an existing aerial photograph of the Project site. <br />Table 2-1 summarizes the project development totals. The proposed Project includes the <br />development of up to 644 apartment units, 3,500 SF restaurant uses and 11,700 SF of retail space. <br />The proposed Project will provide a total of 1,300 parking spaces within two buildings along with 18 <br />surface parking spaces. "Building A" is proposed as a five -story apartment podium with up to 325 <br />apartment homes consisting of approximately 19 (±5.8%) studio units, 162 (f49.8%) one -bedroom <br />units, 121 (±37.2%) two -bedroom units and 23 (±7.1%) three -bedroom units and approximately <br />6,100 SF of ground floor retail/commercial space and 3,500 SF restaurant space "wrapped" around <br />an eight -level partial subterranean parking structure with a total of approximately 650 spaces along <br />with 9 ground floor spaces for retail/leasing. "Building B" is proposed as a five -story apartment <br />podium with up to 319 apartment homes consisting of approximately 20 (±6.3%) studio units, 164 <br />(±51.4%) one -bedroom units, 127 (±39.8%) two -bedroom units and 8 (±2.5%) three -bedroom units <br />and approximately 5,600 SF of ground floor retail/commercial space "wrapped" around a eight -level <br />partial subterranean parking structure with a total of approximately 650 spaces along with 9 ground <br />floor spaces for retail/leasing. On -site facilities/amenities of the proposed Project include a leasing <br />office, a lounge/lobby, business center, pool/spa, and a fitness center for residents. Figure 2-2 <br />presents the preferred Project site plan, prepared by KTGY. <br />The Project is expected to be constructed and completed by Year 2025, which has been utilized to <br />assess the Project's potential traffic impacts at full occupancy of the project within an opening year <br />traffic setting. <br />2.1 Site Access <br />Vehicular access to the proposed Project will be provided via one (1) full access unsignalized <br />driveway along Park Court Place and one (1) right in/out only driveway located along 4th Street. As <br />part of the proposed Project's design features, an exclusive southbound right -turn lane will be <br />constructed at the intersection of Cabrillo Park Drive/4th Street. Additionally, Project's curb face is <br />planned to be set back far enough to accommodate improvements at I-5 NB Ramps/4th Street, which <br />include the construction of an additional right -turn lane. <br />2.2 Pedestrian Circulation <br />Pedestrian circulation for the proposed Project would be provided via existing public sidewalks <br />along Park Court Place, Cabrillo Park Drive, and 4' Street within the vicinity of the Project. The <br />existing sidewalk system within the Project vicinity provides direct connectivity to the existing <br />development located along major thoroughfares. Pedestrian access to both the residential and retail <br />components of the Project will be provided via building entries/exits located on Park Court Place <br />and 4th Street. <br />