My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(tNO SCALE <br />JN f 912 <br />r 111 <br />1 r <br />r7 <br />LK LN @ <br />"IRST ST <br />JM 1123\ <br />r 145 <br />1- <br />3� / <br />/ <br />3 ON -RAMP/ <br />3URY ST @ <br />4TH ST <br />1320 <br />/ 1021\ <br />378 <br />1563— <br />\ 1051---� / <br />\ \ / / <br />1-5 SIB ON -RAMP @ <br />FIRST ST <br />/ 1090\ <br />927 <br />208--" <br />\ 960ID Ln <br />— <br />N N <br />1-5 NB RAMPS @ <br />4TH ST <br />L \ <br />/ D 1351� <br />478 <br />1076— <br />\ 577---� <br />\ / <br />SR-55 SB RAMPS @ <br />4TH ST <br />18 <br />/�o� 58\ <br />0\ 149 <br />51J <br />1188— r } r / <br />\ 125� <br />CABRILLO PARK DR @ <br />17TH ST <br />/ 6\ <br />114 <br />24 <br />88J } r <br />0) / <br />\ 18� � / <br />PARK CENTER DR @ <br />FRUIT ST <br />® = STUDY INTERSECTION <br />XX,XXX►= STUDY ROADWAY SEGMENT <br />:• = PROJECT SITE <br />/��N 16\ <br />6 <br />/j+� 13� <br />478--� <br />\10680—, <br />CABRILLO PARK DR @ <br />FIRST ST <br />8966\ <br />242-" <br />} <br />764— <br />\ 197---� ill '� <br />\ \ / / <br />CABRILLO PARK DR @ <br />4TH ST <br />/ 769 <br />1402 <br />383--� r <br />\1236— co',' <br />SR-55 NB RAMPS @ <br />4TH ST <br />/ C'4 14\\ <br />59 <br />2J1 } r <br />2— Nrc_) COD' <br />\ 0� Q0 <br />CABRILLO PARK DR @ <br />WELLINGTON AVE <br />/d- a' - 70\ <br />r- r- N f 12 <br />54 <br />125J <br />\ 64� cy)r- M <br />TUSTIN AVE @ <br />FRUIT ST <br />O ho N <br />/o69 <br />92 <br />j + ` r 408 <br />75: <br />1122� } r <br />\ 18� <br />GOLDEN CIRCLE DR @ <br />FIRST ST <br />10 <br />1380\ <br />28--" <br />935— � } 00 <br />r <br />\ \ 4---� / <br />GOLDEN CIRCLE DR @ <br />4TH ST <br />15 /'--- <br />68\ <br />1859\ <br />144-" <br />1204— � } r / <br />YORBA ST @ <br />4TH ST <br />/Doo 16\ <br />N CON 3 \ <br />+ ` f- 33 <br />54J <br />0—� } r/ <br />\ 85-, <br />\ / <br />TUSTIN AVE @ <br />WELLINGTON AVE <br />/ 38\ <br />00rl-'rl- 0 \ <br />/ J I `r- 59 <br />6J �} } r <br />\ 93� oro� <br />CABRILLO PARK DR @ <br />PARK COURT PL <br />/F- T 445\ <br />It CD / l_ r 825 <br />J i <br />660— } / <br />\ 0� <br />\ \ - <br />TUSTIN AVE @ <br />FIRST ST <br />/ o \ <br />/ 61 <br />J 1285 <br />87--' <br />\ 1117— / <br />\ \ — / / <br />PARK CENTER DR @ <br />4TH ST <br />249\ <br />459 <br />229--� <br />\ 51� <br />YORBA ST @ <br />FIRST ST <br />12 <br />0' <br />11 <br />264 \ <br />232-" <br />837— , } r <br />\54---� <br />TUSTIN AVE @ <br />4TH ST <br />U) <br />a� <br />(D <br />U <br />.i <br />0 <br />N <br />I <br />0 <br />1 <br />00 <br />0 <br />rn <br />N <br />J <br />16 /'—� <br />17LO <br />rn <br />� <br />J+ <br />146J <br />} <br />215- <br />1 } <br />\ 127---� <br />� <br />\ 186� <br />\ <br />/ <br />\ <br />/ <br />6 <br />O <br />CABRILLO PARK DR @ <br />CABRILLO PARK DR @ <br />STATE FUND ACCESS RD <br />XEROX CENTRE ACCESS RD a <br />0 <br />V) <br />21 <br />N <br />/� (0 °M° <br />54\ <br />/N <br />10\ <br />I <br />/J <br />s <br />/J 11.�2s <br />x <br />\\ <br />, } <br />\\ <br />} <br />O <br />0 cO <br />� t <br />O <br />24J <br />/ <br />33— <br />\ <br />\ <br />/ <br />\/ <br />\ <br />/ <br />C3 <br />U <br />MABURY ST @ <br />CABRILLO PARK DR @ <br />48 <br />FRUIT ST <br />FRUIT ST <br />FIGURE 6-9 <br />YEAR 2040 BUILDOUT PM PEAK HOUR <br />AND DAILY TRAFFIC VOLUMES <br />4TH AND CABRILLO MIXED -USE PROJECT, SANTA ANA <br />w <br />N <br />0 <br />0 <br />c <br />
The URL can be used to link to this page
Your browser does not support the video tag.