Laserfiche WebLink
9.3 Year 2025 Traffic Conditions <br />Table 9-3 summarizes the peak hour Level of Service results at the at the five (5) state-controlled <br />study intersections for the Year 2025 horizon year. The first column (1) of HCM/LOS values in <br />Table 9-3 presents a summary of existing AM and PM peak hour traffic conditions. The second <br />column (2) lists future Year 2025 cumulative traffic conditions (existing plus ambient growth traffic <br />plus cumulative projects traffic), without any traffic generated by the proposed Project. The third <br />column (3) presents future forecast traffic conditions with the addition of traffic generated by the <br />proposed Project. The fourth column (4) shows the increase in delay value due to the added peak <br />hour project trips and indicates whether the traffic associated with the Project will have a significant <br />impact based on the LOS standards and significant impact criteria defined in this report. The fifth <br />column (5) indicates the anticipated level of service with improvements, if any. <br />9.3.1 Year 2025 Cumulative Traffic Conditions <br />Review of Column (2) of Table 9-3 indicates that the intersection of SR-55 SB Ramps/4th Street is <br />forecast to operate at unacceptable LOS F in the AM peak hour. The remaining state-controlled <br />study intersections are forecast to operate at LOS C or better during the weekday AM and PM peak <br />hours. <br />9.3.2 Year 2025 Cumulative Plus Project Traffic Conditions <br />Review of columns (3) and (4) of Table 9-3 indicates that the intersection of SR-55 SB Ramps/4th <br />Street will continue to operate at unacceptable LOS F in the AM peak hour with the addition of <br />project traffic. The remaining state-controlled study intersections are forecast to operate at <br />acceptable LOS C or better during the weekday AM and PM peak hours, with the addition of project <br />traffic. <br />Although the intersection of SR-55 SB Ramps/0' Street is forecast to operate at unacceptable LOS F <br />in the AM peak hour, the intersection is not considered significantly impacted when compared to the <br />LOS standards and significant impact criteria specified in this report. <br />Appendix E presents the Year 2025 HCM/LOS calculations for the state-controlled study intersections. <br />