My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NATIONAL CORROSION (5)
Clerk
>
Contracts / Agreements
>
N
>
NATIONAL CORROSION (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 12:18:18 PM
Creation date
8/22/2023 2:33:29 PM
Metadata
Fields
Template:
Contracts
Company Name
NATIONAL CORROSION
Contract #
N-2023-208
Agency
Public Works
Expiration Date
3/15/2025
Insurance Exp Date
10/15/2025
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NATIONAL National Corrosion <br />CORROSION www.ncitional-corrosion.com <br />• Prepare cost estimates for recommendations and remediations <br />A rough draft report will be submitted to allow for comments and recommendations. A final <br />draft will be submitted in both electronic and hard copy format. <br />Deliverables <br />Preliminary repair procedures and Specifications — National Corrosion will produce written procedures <br />and coating specifications as a draft to be reviewed by the City of Santa Ana. Comments and revisions <br />may be made at this time. <br />Final Des!&n —This task will include preparation of standard drawings and specifications (90% and Final): <br />90% Design Submittal — Prepare drawings and technical specifications for the proposed repairs <br />and coating specifications approved by the City after the Preliminary Report was submitted and <br />reviewed. Plans shall be drawn to scale (lightened record drawing plans may be used as a <br />background) and suitable for competitive public works bidding. The designed CP systems will be <br />contained within the city property and/or public right-of-way. A project schedule, and <br />engineer's estimated construction cost may be a part of the submittal. The plans and <br />specifications will be provided for the city to review. After incorporation of city comments into <br />the documents, hardcopies will be submitted to the pertinent cities for review, comment, and <br />applicable permit applications. The city will pay the permit review fees directly. <br />Final Design Submittal — All revisions from 90% design review will be used to prepare the final <br />plans and specifications. This submittal shall include final construction plans, bid item schedule <br />including quantities, descriptions, specifications, and technical provisions for the project. An <br />engineer's estimate of probable construction costs will also be included. A complete set of <br />construction plans and specifications via digital copies in PDF format and 2018 version of <br />AutoCAD .dwg format (with pen settings file) will be provided. National Corrosion shall provide a <br />copy of all required permits along with construction requirements if necessary. <br />Construction Phase / Inspection <br />Submittal/Shop Drawing Review — Review Contractor submittals for completeness and <br />conformity with the contract documents. Review any deviations and/or substitutions submitted <br />by the contractor and make recommendations to the city. <br />Requests for Information (RFIs) — Review contractor's request for information and prepare <br />responses to the contractor. Prepare any revisions to contract documents necessary to resolve <br />conflicts. Assume 10 RFIs. <br />Inspection and Quality Control — Aid the city during repairs and procedures by providing on -site <br />as -needed inspection services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.