My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOC ARCHITECTS
Clerk
>
Contracts / Agreements
>
L
>
LOC ARCHITECTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:46:55 PM
Creation date
8/22/2023 4:52:43 PM
Metadata
Fields
Template:
Contracts
Company Name
LOC ARCHITECTS
Contract #
A-2023-136
Agency
Public Works
Council Approval Date
8/1/2023
Expiration Date
7/31/2023
Insurance Exp Date
3/28/2025
Destruction Year
2031
Notes
FOR INSURANCE SEE THE NOTICE OF COMPLIANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant shall provide support to the City during the Bidding phase by assisting with <br />questions, requests for information/clarification, or conflicts arising out of the bidding <br />process. Consultant shall also attend pre -bid meeting, if scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by <br />assisting with questions, requests for information/clarification, and/or reviewing submittals. <br />Record Drawings /As-GL6ilt Plans <br />Upon construction completion, consultant shall incorporate as -built information, as <br />provided by the General Contractor, into the drawing files to provide record drawings for <br />City archives. <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured <br />to correspond to the above mentioned tasks as follows: <br />Task 1: Pre -Design <br />Task 2: Concept Design <br />Task 3: Design Development <br />Task 4: Construction Documents <br />Task 5: Bid Advertisement, Construction Administration, Record Drawings <br />Total Fee: <br />Fee schedule for each task should include an hourly breakdown that corresponds to the task total. <br />City Responsibilities <br />The City will be responsible for the following items: <br />• Provision of available plans and existing documentation on file. <br />• Provision of electronic design file with City title block and title sheet (24" x 36") <br />• Provision of standard City boilerplate specifications. <br />• Acting as liaison with the appropriate decision making bodies, as necessary, <br />• Coordination and processing of plans and documents with governmental agencies having <br />jurisdiction over the project. <br />City of Santa Ana RFP 23-033 <br />Page Al-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.