Laserfiche WebLink
Alliance Burton Tech High School <br />Location: South Los Angeles <br />Client: Alliance College -Ready Charter Schools <br />Size: 9,400 sf <br />Budget: $6 Million <br />Projected Completion: December 2024 <br />LOC won the RFP to design a new building to <br />compliment the Alliance College -Ready School's <br />Judie Ivie Burton Technology High School campus. <br />Working closely with the school team, LOC designed <br />a two story classroom builddng with a rooptop outdoor <br />space. The project maximizes natural light and view to <br />the exterior while making a connection to the existing <br />campus and helping to foster the school's role as a <br />pivotal entity in the South Los Angeles neighborhood. <br />The project is currently in permitting. <br />4 <br />L 0 C SANTA ANA ZOO Saniq� <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP <br />March 23, 2023 <br />33 <br />