Laserfiche WebLink
LOC <br />3203 E 41^ St. <br />Los Angeles, CA 90063 <br />213.537.0480 <br />w Joc-archxorn <br />Schedule <br />Completion of architectural services up to the conclusion of Construction Documents and <br />the issuance of a Ready -to -Issue Building Permit is estimated at approximately 38 weeks, <br />with interim milestones as described below. The Schedule is subject to revision based on <br />any changes in the Scope of Work. <br />Schematic Design <br />Design Development <br />Construction Documents <br />Permitting / Bidding <br />Construction Observation <br />Payment Schedule <br />The Architectural fee shall <br />phase: <br />6 weeks <br />8 weeks <br />12 weeks . <br />12 weeks <br />52 weeks <br />be billed monthly based upon the following allocation per <br />Schematic Design (15%) <br />$23,400 <br />Design Development (25%) <br />$39,000 <br />Construction Documents (35%) <br />$62,400 <br />Bidding (5%) <br />$7,800 <br />Construction Observation (20%) <br />$23,400 <br />Total Fee <br />$156,000 <br />Unless otherwise agreed to, payments for services shall be made monthly in proportion to <br />services performed. Payments are due and payable upon presentation of the Architect's <br />invoice. <br />Exclusions <br />• The cost of sub -consultants necessary to complete this project not expressly <br />included herein. Sub -consultants shall be engaged by and managed by LOC and <br />shall be billed at a rate of 1.15 time the actual cost. <br />• Presentation quality models of the project are at the architect's discretion unless <br />specifically requested by the Owner as an Additional Service. <br />• Reproduction or other project related expenses, which shall be billed at a rate of <br />1.15 time the actual cost. <br />