Laserfiche WebLink
Cabrillo Town Center (Future) Detailed Report, 7/26/2023 <br />Removed <br />Subtotal <br />Daily, Winter (Max) <br />Avoided <br />Subtotal <br />Sequestered <br />Subtotal <br />Removed <br />Subtotal <br />Annual — — — — — <br />Avoided — — — — — — — <br />Subtotal — — — — — — — <br />Sequestered — — — — — — — <br />Subtotal — — — — — — — <br />Removed — — — — — — — <br />Subtotal — — — — — — — <br />5. Activity Data <br />5.1. Construction Schedule <br />Demolition Demolition 9/2/2024 10/31 /2024 5.00 44.0 Site Preparation Site Preparation 11/1/2024 11/7/2024 5.00 5.00 — <br />Grading City C6rOlArdl 11/8/2024 1fB/202P086 5.00 61.0 10/3/2023 <br />34/50 <br />