Laserfiche WebLink
Cabrillo Town Center (Future) Detailed Report, 7/26/2023 <br />Paving <br />Paving Equipment <br />Diesel <br />Average <br />2.00 <br />8.00 <br />89.0 <br />0.36 <br />Paving <br />Rollers <br />Diesel <br />Average <br />2.00 <br />8.00 <br />36.0 <br />0.38 <br />Architectural Coating <br />Air Compressors <br />Diesel <br />Average <br />1.00 <br />6.00 <br />37.0 <br />0.48 <br />Trenching <br />Trenchers <br />Diesel <br />Average <br />1.00 <br />8.00 <br />40.0 <br />0.50 <br />5.3. Construction Vehicles <br />5.3.1. Unmitigated <br />Demolition <br />- <br />- <br />- <br />- <br />Demolition <br />Worker <br />15.0 <br />18.5 <br />LDA,LDTI,LDT2 <br />Demolition <br />Vendor <br />- <br />10.2 <br />HHDTMHDT <br />Demolition <br />Hauling <br />54.5 <br />20.0 <br />HHDT <br />Demolition <br />Onsite truck <br />- <br />- <br />HHDT <br />Site Preparation <br />- <br />- <br />- <br />Site Preparation <br />Worker <br />17.5 <br />18.5 <br />LDA,LDTI,LDT2 <br />Site Preparation <br />Vendor <br />- <br />10.2 <br />HHDTMHDT <br />Site Preparation <br />Hauling <br />28.2 <br />20.0 <br />HHDT <br />Site Preparation <br />Onsite truck <br />- <br />- <br />HHDT <br />Grading <br />- <br />- <br />- <br />- <br />Grading <br />Worker <br />20.0 <br />18.5 <br />LDA,LDTI,LDT2 <br />Grading <br />Vendor <br />- <br />10.2 <br />HHDTMHDT <br />Grading <br />Hauling <br />0.82 <br />20.0 <br />HHDT <br />Grading <br />Onsite truck <br />- <br />- <br />HHDT <br />Building Construction <br />- <br />- <br />- <br />- <br />Building Construction <br />Worker <br />521 <br />18.5 <br />LDA,LDTI,LDT2 <br />Building Construction; <br />fendeF <br />i 46 <br />49.2 <br />19T"ql 19T <br />City Council <br />18 - 1088 <br />10/3/2023 <br />36 / 50 <br />