Laserfiche WebLink
Cabrillo Town Center (Future) Detailed Report, 7/26/2023 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Demolition 0.00 <br />0.00 <br />0.00 <br />6,000 <br />Site Preparation — <br />1,422 <br />7.50 <br />0.00 <br />Grading — <br />400 <br />183 <br />0.00 <br />Paving 0.00 <br />0.00 <br />0.00 <br />0.00 <br />5.6.2. Construction Earthmoving Control Strategies <br />Water Exposed Area 2 61 % 61 % <br />Water Demolished Area 2 36% 36% <br />5.7. Construction Paving <br />Es1PA <br />PavedAsphalt <br />Apartments Mid Rise <br />— <br />0% <br />Strip Mall <br />0.00 <br />0% <br />Enclosed Parking with Elevator <br />8.08 <br />100% <br />Parking Lot <br />0.10 <br />100% <br />Enclosed Parking Structure <br />1.04 <br />100% <br />General Office Building <br />0.00 <br />0% <br />Condo/Townhouse <br />— <br />0% <br />5.8. Construction Electricity Consumption and Emissions Factors <br />City Council 18 — 1090 10/3/2023 <br />38 / 50 <br />