My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabrillo Town Center (Future) Detailed Report, 7/26/2023 <br />Project Located in a Low -Income Community (Assembly Bill 1550) Yes <br />Project Located in a Community Air Protection Program Community (Assembly Bill 617) No <br />a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. <br />b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. <br />7.4. Health & Equity Measures <br />No Health & Equity Measures selected. <br />7.5. Evaluation Scorecard <br />Health & Equity Evaluation Scorecard not completed. <br />7.6. Health & Equity Custom Measures <br />No Health & Equity Custom Measures created. <br />8. User Changes to Default Data <br />Land Use <br />Construction: Construction Phases <br />Construction: Off -Road Equipment <br />Construction: Trips and VMT <br />Operations: Hearths <br />Project plans and LLG trip generation estimates. Population based on SCAG's average 2016 <br />persons -per -household rate for the City of 4.6 persons per household. <br />Developer information <br />10 CY haul truck capacity during demolition, 14 CY during site preparation and grading. <br />Developer information <br />City Council <br />18 —1102 <br />50/50 <br />10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.