My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grant Williams <br />December 9, 2022 <br />Page 11 <br />Tables 3 and 4 present the overall weekday and weekend parking demand profiles for <br />the retail/commercial and residential guest components of the Project based on the <br />shared parking methodology. Columns (1) through (3) of these tables present the <br />parking accumulation characteristics and parking demand of the proposed uses for the <br />hours of 6:00 AM to midnight. Columns (4) through (5) presents the expected joint -use <br />parking demand for the Center on an hourly basis and further presents the hourly <br />parking surplus/deficiency for the proposed Project compared to the parking supply of <br />90 spaces. Both tables highlight the forecast peak parking demand for the <br />retail/commercial center component of the Project during the morning peak hour <br />(shown inM), afternoon peak period (shown inM) and evening peak hour (shown <br />in ). <br />Based on our experience, the shared parking approach summarized in Tables 3 and 4 are <br />believed to be the most appropriate in evaluating the parking supply -demand <br />relationships for Project. The results in these tables are the focus of this parking <br />investigation and recommendations. <br />Shared Parking Results <br />Review of Tables 3 and 4 indicates that the future full occupancy weekday peak <br />retail/commercial and residential guest parking demands will occur at 7:00 PM with a <br />peak demand of 81 spaces. Based on the proposed retail/commercial and residential <br />guest parking supply of 90 spaces, the peak demand hours on a weekday will result in <br />a surplus of 9 spaces. On a weekend, a peak parking demand will occur at 7:00 PM <br />and 8:00 PM with peak demands of 79 spaces resulting in a surplus of 11 spaces. <br />Appendix A contains the detailed weekday and weekend shared parking worksheets. <br />Figures 4-1 and 4-2 graphically illustrate the weekday and weekend hourly parking <br />demand forecast for the shared parking component, respectively. Each of the <br />anticipated land use component/tenant mix and its corresponding hourly Shared <br />Parking demand for various mixes of uses, which were presented in Tables 3 and 4, <br />are depicted in these two figures relative to a proposed parking supply of 90 spaces. A <br />review of these figures indicates that the Project's parking supply for the <br />retail/commercial and resident guest of 90 spaces will adequately accommodate the <br />weekday and weekend hourly shared parking demand <br />CONCLUSIONS <br />Based on the above, it is concluded that adequate parking will be provided to satisfy <br />the parking demand for residents, guests and employees of the Cabrillo Town Center <br />Mixed -Use Project. Nevertheless, to ensure adequate parking is provided for all users <br />Of tCity d6uncil 18 — 3 4 10 3/2023 <br />N:\4500\2224531 - Fairfield Cabrillo Town Center, Santa Ana\Parking & PMP\4531 Cabrillo Town Center Parking Study & Parking Management Plan 12-09-2022.do- <br />
The URL can be used to link to this page
Your browser does not support the video tag.