My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Any concerns between monitors and construction personnel shall be addressed by the City of Santa Ana, <br />Planning Department. <br />4.4 LIST OF MITIGATION MEASURES <br />As mentioned above, due to the program- and project -level components of this EIR, the MMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are listed in Table 4-1. The <br />mitigation measures, which include several mitigation measures from the program -level component, that <br />pertain to the First and Cabrillo Towers project are listed in Table 4-2. All project -specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br />The mitigation monitoring matrix on the following pages is formatted to parallel the format of the <br />Executive Summary table contained in the Final EIR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4-2 have <br />been modified slightly so as to directly apply to the First and Cabrillo Towers project. The content and <br />action required by each mitigation measure have not been modified. <br />4-2 City Council 18 — 401 Yby/ 112M23 Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.