My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8 <br />Parking Provided <br />Unit Type <br />Number of Units <br />Ratio Per Unit <br />Required Spaces <br />Parcel 1 <br />Studios <br />23 <br />2.0 <br />46 <br />1 bedroom <br />262 <br />2.0 <br />524 <br />2 bedroom <br />145 <br />2.0 <br />290 <br />Shopkeeper <br />19 <br />2.0 <br />38 <br />Subtotal <br />898 <br />Parcel 2 <br />2 bedroom <br />12 <br />2.2 <br />26 <br />3 bedroom <br />34 <br />2.2 <br />75 <br />4 bedroom <br />12 <br />2.2 <br />26 <br />Subtotal <br />127 <br />Total <br />1,025 <br />Source: AO Architects, March 16, 2023. <br />1.3.6 Estimated Construction Schedule <br />The Project's construction phase would occur over an estimated 36-month period. The estimated <br />construction schedule is shown in Table 9. <br />Table 9 <br />Construction Schedule Assumptions <br />Phase <br />Duration <br />Notes <br />Removal of 6,000 tons of demolition debris in 10-cubic yard <br />Demolition <br />Months 1-2 <br />capacity trucks, hauled up to 20 miles to the Olinda Alpha <br />Landfill. <br />Site Preparation <br />Month 3 (one <br />Grubbing and removal of trees, plants, landscaping, weeds <br />week) <br />over a 64,000 square -foot area <br />Grading <br />Months 3-5 <br />Approximately 400 cubic yards of soil hauled 20 miles to <br />Olinda Alpha Landfill in 14-cubic yard capacity trucks. <br />Trenching for utilities, including gas, water, electricity, and <br />Trenching <br />Months 6-8 <br />telecommunications. <br />Paving <br />Months 9-11 <br />Flatwork, including paving of driveways and walkways <br />Footings and foundation work (e.g., pouring concrete pads), <br />Building Construction <br />Months 12-36 <br />framing, welding; installing mechanical, electrical, and <br />plumbing. Floor assembly, cabinetry and carpentry, elevator <br />installations, low voltage systems, trash management. <br />Architectural Coatings <br />Months 33-36 <br />Application of interior and exterior coatings and sealants. <br />Source: Fairfield and DKA Planning, 2023. <br />Cabrillo Town Center City of Santa Ana <br />TechQ" nno..,,,r-1— nip - 2023 <br />City Council 42 18 — 476 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.