My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Where the later activities involve site -specific operations, the agency should use a <br />written checklist or similar device to document the evaluation of the site and the activity to <br />determine whether the environmental effects of the operation were within the scope of the <br />program EIR. <br />2.1.2 Applicability of CEQA Guidelines Section 15168 to the Project <br />The Certified EIR meets the definition under Guidelines Section 15168(a) because the Certified <br />EIR analyzed the potential impacts associated with the Overlay Zone, which is a generally <br />applicable plan containing rules, regulations and other general criteria governing a specified <br />geographically contained area. The Certified EIR fully analyzed the potential environmental <br />effects associated with the City's adoption of the Overlay and subsequent foreseeable <br />development within the Overlay Zone. As discussed below, the Project is fully consistent with <br />the Overlay Zone and within the scope of the Certified EIR. <br />The Project Site is located in the Village Center District of the Overlay Zone. Uses allowed in the <br />Village Center District include a mix of commercial, office, and residential in mid -rise buildings of <br />between 4 and 10 stories in a setting that provides open spaces, niches, and areas for gatherings <br />and activities along streets, paseos, and interconnecting walkways that link the Village Center to <br />adjacent districts and nearby public parks north of the Village Center District. The Project meets <br />this description by including development of the Project Site with a mixed -use development <br />including up to 507 residential dwelling units (including apartments, live/work units, and <br />townhomes), approximately 26,800 square feet of commercial uses, and associated parking, <br />utility infrastructure, landscaping, and open space in accordance with the Development <br />Standards outlined in Table 1 in the Project Description of the Draft EIR portion of the Certified <br />EIR. <br />As shown in Figure 3, the Project Site would be separated into two distinct areas by a roadway <br />(Parkcourt Place), which would traverse the site east/west. The northern portion of the Project <br />Site would be developed with eight, three-story (37 feet and 1 inch in height) buildings with 58 <br />townhomes arranged around a central open space area. Each townhome would include two, <br />three, or four bedrooms, a parking garage, and private outdoor space. The southern portion of <br />the Project Site would be developed with a five -story mixed -use building arranged around an <br />internal parking structure and one subterranean level that includes residential storage. This <br />building would include 449 apartment units and 26,800 square feet of ground -floor commercial <br />uses, which could include retail, office, and shopkeeper, and would also surround a central open <br />space area. The Project also includes development of pedestrian infrastructure to connect the <br />Project to adjacent land uses. As demonstrated here, the Project would be consistent with the <br />allowable development under the Overlay Zone. <br />Finally, as demonstrated in Section 4 of this technical memorandum, all applicable mitigation <br />measures from the Certified EIR would be implemented by the Project, and each of the applicable <br />mitigation measures would also be made conditions of approval for the Project. <br />The analysis contained in Section 3 of this technical memorandum demonstrates that pursuant to <br />Public Resources Code Section 21166 and CEQA Guidelines Section 15162, there are no <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 479 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.