Laserfiche WebLink
Despite being omitted from the Certified EIR, an analysis of potential impacts related to the <br />Project's GHG emissions is included in this document. <br />3.2.9 Hazards and Hazardous Materials <br />These checklist questions were revised to delete Checklist Question Vlll.f regarding safety <br />hazards associated with proximity to a private airstrip and to clarify that Checklist Question VIILg <br />(formerly Checklist Question Vlll.h) includes both direct or indirect impacts associated with <br />wildland fires. All of the checklist questions as presented in the updated Appendix G checklist are <br />addressed in Section 4.6, Hazards and Hazardous Materials, of the Draft EIR portion of the <br />Certified EIR. <br />3.2.10 Hydrology and Water Quality <br />These checklist questions were revised to provide clarification and eliminate redundancy. All of <br />the topics addressed in these checklist questions, including those related to water quality, <br />groundwater, flooding, and flood hazards, are thoroughly addressed in Section 4.7, Hydrology <br />and Water Quality, of the Draft EIR portion of the Certified EIR. <br />3.2.11 Land Use and Planning <br />Checklist Question Ka (introduce new land uses that would result in conflicts of use) was removed <br />prior to the 2018 revisions. Checklist Question X.c was revised to focus on conflicts with any land <br />use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental <br />effect. Checklist Question X.d was deleted, as it addressed habitat conservation plans, which are <br />already addressed under the biological resources checklist questions. An analysis of the Project's <br />consistency with land use plans, policies, and regulations is provided in Section 4.8, Land Use <br />and Planning, of the Draft EIR portion of the Certified EIR. <br />3.2.12 Mineral Resources <br />These checklist questions were not updated as part of the modifications and are responded to in <br />the Initial Study that preceded the Draft EIR and is included in Appendix A of the Draft EIR portion <br />of the Certified EIR. <br />3.2.13 Noise <br />Checklist Questions Xll.a and Xll.b were revised to focus on impacts associated with the <br />generation of noise and vibration noise levels. In addition, Checklist Questions Xll.c, Xll.d, and <br />Xll.f were deleted, as they were redundant, and Checklist Question XI I.e was revised accordingly. <br />The topics associated with these modified questions are fully addressed in Section 4.9, Noise, of <br />the Draft EIR portion of the Certified EIR. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 483 10/3/2023 <br />