Laserfiche WebLink
Wildland Fires <br />The Project Site is located in a dense urban environment and is surrounded by existing <br />development. Further the Project Site is not located within a designated Very High Fire Hazard <br />Severity Zone or State Responsibility Area where wildfire risk is most acute. There are no wildland <br />areas, nor wildland interface areas, located in the vicinity of the Project Site. Thus, the Project <br />would not result in any new or increased significant impacts related to wildland fires beyond <br />impacts already identified in the Certified EIR. <br />Mitigation Measures <br />The Project would implement Mitigation Measures MM-OZ 4.6-5, MM-OZ 4.6-6, and MM-OZ 4.6- <br />7 from the Certified EIR. <br />4.9.3 Any substantial changes in circumstances involving new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />No substantial changes in the circumstances related to hazards and hazardous materials have <br />occurred within the vicinity of the Project Site since the certification of the Certified EIR that would <br />result in new or more severe significant environmental impacts. <br />4.9.4 Any new information of substantial importance that demonstrates that the Project <br />would result in new significant impacts or substantial increase in the severity of significant <br />impacts? <br />There is no new information of substantial importance that has become available relative to <br />hazards and hazardous materials that would result in new or more severe significant <br />environmental impacts. <br />4.9.5 Mitigation Measures Addressing Impacts <br />The Project would implement Mitigation Measures MM-OZ 4.6-1, MM-OZ 4.6-2, MM-OZ 4.6-3, <br />MM-OZ 4.6-5, MM-OZ 4.6-6, and MM-OZ 4.6-7 from the Certified EIR. <br />4.9.6 Conclusion <br />Based on the above, no new significant impacts or a substantial increase in previously identified <br />impacts to hazards and hazardous materials would occur as a result of the Project. Therefore, <br />the impacts to hazards and hazardous materials do not meet the standards for a subsequent or <br />supplemental EIR pursuant to PRC Section 21166 and CEQA Guidelines Section 15162. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 580 10/3/2023 <br />