Laserfiche WebLink
Cabrillo Town Center (Future) Detailed Report, 7/26/2023 <br />Demolition <br />Vendor <br />— <br />10.2 <br />HHDT,MHDT <br />Demolition <br />Hauling <br />54.5 <br />20.0 <br />HHDT <br />Demolition <br />Onsite truck <br />— <br />— <br />HHDT <br />Site Preparation <br />— <br />— <br />— <br />Site Preparation <br />Worker <br />17.5 <br />18.5 <br />LDA,LDTI,LDT2 <br />Site Preparation <br />Vendor <br />— <br />10.2 <br />HHDT,MHDT <br />Site Preparation <br />Hauling <br />28.2 <br />20.0 <br />HHDT <br />Site Preparation <br />Onsite truck <br />— <br />— <br />HHDT <br />Grading <br />— <br />— <br />— <br />— <br />Grading <br />Worker <br />20.0 <br />18.5 <br />LDA,LDTI,LDT2 <br />Grading <br />Vendor <br />— <br />10.2 <br />HHDT,MHDT <br />Grading <br />Hauling <br />0.82 <br />20.0 <br />HHDT <br />Grading <br />Onsite truck <br />— <br />— <br />HHDT <br />Building Construction <br />— <br />— <br />— <br />— <br />Building Construction <br />Worker <br />521 <br />18.5 <br />LDA,LDTI,LDT2 <br />Building Construction <br />Vendor <br />116 <br />10.2 <br />HHDT,MHDT <br />Building Construction <br />Hauling <br />0.00 <br />20.0 <br />HHDT <br />Building Construction <br />Onsite truck <br />— <br />— <br />HHDT <br />Paving <br />— <br />— <br />— <br />— <br />Paving <br />Worker <br />15.0 <br />18.5 <br />LDA,LDTI,LDT2 <br />Paving <br />Vendor <br />— <br />10.2 <br />HHDT,MHDT <br />Paving <br />Hauling <br />0.00 <br />20.0 <br />HHDT <br />Paving <br />Onsite truck <br />— <br />— <br />HHDT <br />Architectural Coating <br />— <br />— <br />— <br />— <br />Architectural Coating <br />Worker <br />104 <br />18.5 <br />LDA,LDTI,LDT2 <br />Architectural Coating <br />Vendor <br />— <br />10.2 <br />HHDT,MHDT <br />Architectural Coating <br />Hauling <br />n nn <br />gn n <br />HHnT <br />City Council <br />18 — 749 <br />10/3/2023 <br />41 / 55 <br />