My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Site and Project Description <br />The subject site is a rectangular shaped approximately 9-acre site located at the northeast corner of <br />the intersection of E. 4ti' street and Cabrillo Park Drive in the City of Santa Ana, California. The site <br />is bounded by a baseball field to the north, East Cabrillo Park Drive to the west, East 4tn street to the <br />south, and a parking lots and commercial/office buildings to the east (Figure 1, Site Location Map). <br />The entrance into the site is of Cabrillo Park Drive. <br />Based on our review, the site is currently occupied by four commercial structures and asphalt <br />pavement. Two buildings are located at the southeast and southwest corners, one at the northwest <br />corner and one at middle of the east border. It is surrounded by an asphaltic parking lot. <br />It is our understanding that the proposed development will be consisting of 3-story townhomes in the <br />north area (Area 1 - shown in blue) and a five -story wrap with parking structure in the south area <br />(Area 2 - shown in yellow) as shown on the Boring Location Map (Figure 2). Future grading of the <br />site is anticipated to consist of minor design cuts and fills in order to achieve finish grades. <br />Appurtenant structures, carports, parking areas, driveways, storm water filtration systems, <br />landscaping, and associated utilities will also be constructed to support the new development. <br />1.3 Subsurface Investization and Laboratory Testing <br />Our subsurface investigation was performed on November 22" d, 2021 and consisted of three hollow <br />stem auger borings (B-LGC-1 through B-LGC-3). The geotechnical borings were all excavated to a <br />depth of approximately 51.5 feet below the existing grade. The approximate locations of the borings are <br />shown on the Boring Location Map (Figure 2). Based on a review of the seismic hazard zone maps <br />prepared by the California Geological Survey (CGS, 2002), the site is not located within a seismic <br />hazard area for potential liquefaction, but is located near a liquefaction hazard area, and has a historic <br />high groundwater elevation of approximately 40 feet below the existing ground surface. Therefore, to <br />evaluate the liquefaction and seismically induced dry sand settlement potentials, LGC advanced all <br />three borings to depths of up to approximately 51.5 feet below the ground surface, and collected <br />samples and SPT blow counts at 2.5-foot intervals. These borings were also used to evaluate the <br />consolidation potential, hydro -collapse potential, and to characterize the near -surface geotechnical <br />characteristics of the site. The borings were sampled and logged from the surface under the supervision <br />of a licensed Engineering Geologist/Geotechnical Engineer from LGC. <br />During the subsurface investigation, representative bulk and relatively undisturbed samples were <br />collected for laboratory testing. Laboratory testing was performed by EGLAB, Inc. (EGL). Laboratory <br />testing was performed on representative soil samples and included moisture and density tests, <br />maximum density and optimum moisture content, grain size distribution, Atterberg Limits, expansion, <br />direct shear, consolidation, collapse, and corrosion testing. A summary of the test procedures and <br />printouts of the laboratory test results are presented in Appendix C. The moisture and density test <br />results were presented on the boring logs included in Appendix B. <br />Project i y ounci1 18 — 816 1 3 , 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.