■ Street Rehabilitation, Project 313. Construction inspection,
<br />material testing, and project controls services to assist with
<br />the implementation of street rehabilitation improvements
<br />including slurry sealing of various streets within the City
<br />right-of-way, The scope of work for this project includes
<br />mobilization, surveying, traffic control, edge grind, crack
<br />sealing, remove and replace AC paving, removal of existing
<br />traffic striping and markers, Type I and II RPMS, replace
<br />traffic striping, markers, and other incidental items of work.
<br />■ Oak Knoll South Parking Lot Seal Coat Project 332.
<br />Construction inspection and project controls services for the
<br />rehabilitation of the entire parking lot surface, replacement
<br />of signs, and other incidental items of work.
<br />■ Concrete Rehabilitation Project 293. Construction
<br />inspection, materials testing and project controls services
<br />to assist with the implementation of the citywide concrete
<br />rehab improvements.
<br />■ Arterial Rehabilitation, Project 316. Full-time inspection
<br />services, project controls to assist our inspector in the field,
<br />and material testing.
<br />■ Non-CIP Project Inspection Services. Part-time and
<br />intermittent inspection services.
<br />On -Call Construction Management/Engineering
<br />Support/Testing and Inspection Services
<br />Hawaiian Gardens, CA
<br />Client: City of Hawaiian Gardens
<br />Contact: Neema Ghanbari, Public Works Manager;
<br />562.420.2641 ext. 206; nghanbari@hgcity,org
<br />Services: Construction Management, Inspection
<br />Start:04/2023 Complete: Ongoing
<br />Ardurra provides the City with public works inspection for citywide
<br />CIP construction projects. Work has included residential street
<br />rehabilitation and roofing projects, such as the following:
<br />■ Residential Street Rehabilitation, Project 101.
<br />Construction inspection for this project that consists of
<br />full roadway reconstruction of various streets in Hawaiian
<br />Gardens within the City right-of-way. The scope of work
<br />includes traffic control, protect in place various items;
<br />removal and construction of concrete sidewalk, curb
<br />and gutter, driveway approaches, curb ramps, parkway
<br />drain; 2" deep cold mill; furnish and place 6" thick crushed
<br />miscellaneous base (CMB), 2" ARHM overlay; adjust
<br />manhole and cover to finish grade, adjust water valve can
<br />and cover to finish grade; adjust water meter box and cover
<br />to finish; provide construction survey; install traffic signal
<br />loop detector, traffic striping, signing and marking,
<br />■ C. Robert Lee Roof Replacement, Project 102.
<br />Construction inspection for roof replacement improvements
<br />that include removal and replacement of the existing
<br />roof, air ducts, rain gutters, and all other appurtenances,
<br />miscellaneous replacement of structural plywood,
<br />electrical disconnectionslreconnections, and mechanical
<br />disco nnectionslreconnections.
<br />On -Call CM & Inspection Services
<br />Ontario, CA
<br />Client: City of Ontario
<br />Contact: Bryan Lirley, PE, QSD, Assistant City Engineer;
<br />909.395,2137; blirley@ontarioca.gov
<br />Services: Construction Management, Inspection
<br />Start: 07/2021 Complete: Ongoing Project Value: $1,2M
<br />Ardurra provides public works inspection for the City's annual
<br />pavement rehabilitation and slurry seal project as well as permit
<br />inspection. Work includes, but is not limited to, maintaining more
<br />than 1,200 lane miles of pavement within the city, rehabilitating
<br />existing street pavements, sidewalks, handicap ramps, curb and
<br />gutter, and related appurtenances; repairing or constructing storm
<br />drain improvements at various locations throughout the City; and
<br />providing engineering contract management and field services
<br />support for all construction work within the public right-of-way.
<br />On -Gall Municipal Engineering/Staff Augmentation
<br />Lake Forest, CA
<br />Client: City of Lake Forest
<br />Contact: Tom Wheeler Director of Public Works/City Engineer;
<br />949.461.3480; twheelerglakeforestca,gov
<br />Services: Project Management, Engineering, Staff Augmentation,
<br />Traffic Engineering, Flood Control, Inspection
<br />Start: 0612011 Complete: 06/2024 Project Value: $163M
<br />Ardurra is responsible for managing plan checking and inspection
<br />of various residential developments and the single -property
<br />developmentlremodels throughout the city. Tasks include
<br />short- and long-term CIP planning and budgeting, researching
<br />matters related to regulations and ordinances, funding options,
<br />assistance with the operating budget, and any other needs of
<br />the City. Deliverables are varied and include plan and reports for
<br />rough grading plans, precise grading plans, street and alley plans,
<br />storm drain plans, hydrology reports, hydraulic reports, street
<br />lighting plans, traffic signal plans, traffic control plans, landscape
<br />and irrigation plans, retaining and MSE wall plans, and water and
<br />sewer plans.
<br />Work includes inspection for ADA ramps, street lighting
<br />installations, all encroachment permit projects, grading, storm
<br />drain, wet and dry utilities, curb and gutter projects, sidewalk
<br />projects and all restoration projects within an encroachment
<br />permit. Wet utility agencies include El Toro Water District, Irvine
<br />Ranch Water District, Santa Margarita Water District and Trabuco
<br />ARDURRA