Laserfiche WebLink
The City of Gardena made improves to the existing <br />roadway and associated infrastructure along Budlong <br />Avenue and Halldale Avenue. The improvements <br />included cold milling, ARHM overlays, various <br />concrete improvements, traffic signal improvements, <br />striping and raised pavement markings, and tree <br />removal and planting. <br />The City selected Cannon to provide construction <br />management and inspection services. The project <br />consisted of the installing approximately 780 tons <br />of asphalt concrete (AC), 3,250 tons of asphalt <br />rubberized hot mix (ARHM), 144,400 square feet (SF) <br />of slurry seal, 215 linear feet (LF) of curb & gutter, 980 <br />SF of sidewalk, 2,430 SF of concrete driveway, and <br />420 SF of alley approach. The project was completed <br />in 75 working days. <br />The Van Ness Avenue and 139th Street Improvements <br />will improve pedestrian safety and traffic circulation for <br />motorists, as well as improve drainage patterns. <br />Cannon provided construction management and <br />inspection services to assist in implementing the <br />project. Improvements included replacing non- <br />compliant ADA ramps; edge grinding; cold milling of <br />the existing pavement with localized removal; replacing <br />the existing asphalt/structural section of the highway; <br />repaving; removal and replacement of curb, gutter, <br />and sidewalk; removal and replacement of trees; <br />resetting valve boxes, manhole frames, and covers; <br />and modifying striping and signals. The project also <br />requires extensive coordination of traffic control and <br />close coordination with emergency services, local <br />agencies, utility companies, and the public in this high <br />traffic location. <br />Currently the Contractor has completed each of <br />the removals on the project, including the grinding <br />of asphalt. The contractor has also completed the <br />concrete work and is scheduled to start paving on Feb <br />17, 2022. This will be followed by installing signing, <br />striping, traffic loops, and traffic signal modifications. <br />Project limits extend along Van Ness Avenue from <br />135th street to Marine Avenue and along 139th Street <br />from Van Ness Avenue to Western Avenue. <br />