Laserfiche WebLink
• Mike Bustos Oscar Blanco Amanda Perez <br />• Mario Cisneros Matt Saab Jane Freij <br />• Anivel Nunez Chad Meelker Mike Corral <br />• Paul Merrill - Masoud Eskandari <br />Willdan has provided on call engineering services to the City of Ridgecrest since 2010. In that <br />time, Willdan has completed over 75 projects for the City, providing a multitude of services, <br />such as construction management and inspection, plan checking, design engineering, grant <br />administration, labor compliance, city engineering, landscape architectural, surveying, GIS, <br />environmental clearance, building and safety. We have provided these services to the City for <br />projects funded with local, state, and federal funds. Representative construction management <br />and inspection projects completed under this on -call contract include Downs Street Widening <br />(STPL), West Ridgecrest Boulevard Reconstruction (RPSTPL), Ridgecrest Senior Center <br />Tenant improvements (CDBG), Electric Vehicle Charging Stations and Solar Photovoltaic <br />Improvements (CMAQ), Corporate Yard Site Improvements, New Bus Maintenance Garage and <br />Shade Structure (Design/Build), ADA Transition Plan (CDBG), Sewer System Rehabilitation <br />and Repair Program, Sewer GIS mapping, Walmart Supercenter Offsite Improvements, <br />Richmond Road Bike Path, Bowman Channel Improvements, Dolphin Avenue Improvements <br />(CMAQ), SSARP, Traffic Signal Installation for China Lake Boulevard at Bowman Road (HSIP), <br />Citywide Telecommunications Installation Permit Inspection, Flashing Stop Signs and Adaptive <br />Traffic Signals (HSIP), and Leroy Jackson Park (Clean CA). On many of these projects, Willdan <br />provided turnkey services including design, environmental, bidding assistance, construction <br />management, inspection, labor compliance, grant administration and materials testing. Mr. <br />Bustos, our proposed Project Manager for the City of Santa Ana contract, served as Project <br />Manager for each of these citv proiects. <br />Client: City of Inglewood Dates: 2006- Present <br />• Mike Bustos Manny Trujillo Victor Ayala <br />• Mario Cisneros Jason Brown Miguel Lopez <br />• Simon Hernandez Matthew Villegas Christopher Villegas <br />• Matt Saab Carlos Villegas Masoud Eskandari <br />Willdan has provided on call engineering services to the City of Inglewood since 2011. In that <br />time, Willdan has completed over 22 projects for the City, providing a multitude of services, <br />such as construction management and inspection, plan checking, design engineering, <br />landscape architectural, surveying, and GIS. Representative construction management and <br />inspection projects completed under this on call contract include La Brea Avenue <br />Reconstruction (DEM04L), La Brea Avenue Realignment and Reconstruction (HPLUL), Annual <br />Streets and Alleys Rehabilitation, Imperial Highway Improvements, Prairie Avenue <br />Improvements, Van Ness Avenue Improvements, Inglewood Intermodal Transit/Park and Ride <br />Facility, Service Center Yard Roofing Project, Intelligent Transportation System Gap Closure, <br />Intelligent Transportation System Phases 5 & 6, Los Angeles World Airports Intelligent <br />Transportation System, City Parking Lots Rehabilitation, La Brea and Hardy Traffic Signal <br />Improvements, Century Boulevard Mobility Project Federal Funding Closeout Services, La <br />Tijera Elementary School Improvements (SR2S), and Encroachment Permits Inspection. Mr. <br />Bustos, our proposed Project Manager for the City of Santa Ana contract, served as Project <br />Manager for each of these city projects. <br />On -Call Construction <br />NV Management and Inspection Services 12 <br />