My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:50:22 AM
Creation date
10/3/2023 11:28:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with the City. He possesses over 19 years of public works infrastructure construction <br />management and inspection expertise. He also serves, or served, as AKM's Project Manager for On - <br />Call Construction Management Contracts for the City of Cypress, City of Stanton, City of Fontana, <br />City of Corona, City of Long Beach, Ontario Municipal Utilities Company, South Coast Water District, <br />Water Replenishment District, and West Basin Municipal Water District. Additionally, Mr. Kayiran <br />served as a Subject Matter Expert for the American Public Works Association in support of an <br />overhaul of their public infrastructure inspection training and certification material including co- <br />authoring a new module on the inspection of treatment and pumping facilities. <br />The team has been assembled based familiarity and knowledge with the City and their system, as <br />well as technical expertise such as specific street, building, water, sewer, recycled water facilities <br />construction experience, experience in coordinating with multiple outside agencies, treatment and <br />wellhead experience, proficiency in electrical and automation systems such as programmable logic <br />controllers, variable frequency drives and integration of electrical and instrumentation components <br />into existing SCADA systems. The team also includes multiple experts in scheduling and delay <br />analysis using both Primavera P6 and Microsoft Project, steel and concrete tank construction, as well <br />as specialty coating applications. <br />We have carefully reviewed the form Agreement provided in Attachment 2 of the RFP and concur <br />with all provisions contained within the Agreement. AKM is prepared to execute the Agreement as <br />written upon request from the City. <br />We propose to provide our services to the City on a time and materials basis for not to exceed fees <br />established for each project utilizing our schedule of hourly rates included in this submittal. <br />Our submittal is valid for 120 days. <br />Stated in the RFP, this proposal is to be 10 double sided pages, excluding forms and resumes. <br />However, do to being submitted online, our proposal is 20 pages. It is AKM Consulting Engineer's <br />intent for our proposal to be printed out as 10 double sided pages. <br />We appreciate the opportunity to submit our proposal and look forward to continuing to serve the City <br />of Santa Ana in completing construction management and inspection projects. Should you have any <br />questions regarding our submittal or require additional information, please do not hesitate to contact <br />the undersigned, who possesses full legal authority to bind AKM Consulting Engineers. <br />Very truly yours, <br />AKM Consulting Engi <br />Emin Kayiran, C II <br />Vice President / ftector of Construction Management Services <br />AKM Prop. 23-1061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.