Laserfiche WebLink
�4 <br />On -Call CM/I <br />send and receive emails while on site and complete the daily report as the day progresses. An <br />additional benefit is that all project files will be stored on the tablet so that all project related documents <br />can be accessed from anywhere on the site as opposed to keeping large, hard to transport file boxes <br />requiring returning to the field office to search for documents. <br />The tablets are all wi-fi enabled allowing direct access to our server and web based project document <br />control system. This way, daily reports, photos and all other field generated documentation can be <br />entered directly into the system rather than being saved on the laptop and then copied into the <br />particular document control system. <br />Our goal on any project is to see that quality facilities are constructed on time and within budget, so <br />that such facilities will be a benefit to the City's customers for their full useful life. In order to effectively <br />complete projects, AKM's Construction Management Team becomes a close partner and extension <br />of our clients. We are sensitive to the fact that the City's internal staff has a variety of day-to-day <br />responsibilities beyond any particular construction project. That being said, we have been extremely <br />successful handling the project management workload for our clients during construction, yet still <br />keeping assigned client staff fully abreast of project progress and status. AKM understands that no <br />two agencies or projects are the same, all containing their own unique challenges and nuances. Our <br />Construction Management services are specifically tailored for each client and project to properly <br />serve their best interest and overall project success. For any task order assignment, the project is <br />carefully examined so that the client's goals and objectives are clearly understood by the AKM Team <br />prior to beginning our services. For proposed projects to be successful, detailed and timely attention <br />must be given to the key issues unique to each project. Our methodology for successfully completing <br />any assigned project involves promptly identifying and addressing the key project issues. AKM will <br />begin all projects with identifying key project issues and take proactive measures and planning to <br />mitigate potential impacts. The following describes our methodology for handling common issues <br />that occur during construction projects: <br />Changes in the Construction Industry <br />The engineering and construction industry has seen more change during the past three years, than <br />it had in perhaps the previous 10 years. Two of the most influential factors driving this rapid change <br />have been the global COVID-19 pandemic, and world-wide supply chain issues/shortages of <br />materials and equipment. Both of these factors have required a new way of planning, and <br />approaching projects ranging from on -site safety, to dealing with abnormally long lead-times for <br />materials and equipment. These impacts have required project teams to be adaptable and <br />collaborative to overcome day-to-day effects on projects. The teams that have learned, adapted, and <br />evolved, remain the best positioned to guide their clients through the obstacles that today's <br />construction industry are now faced with. <br />Construction Inconvenience <br />The City's service area encompasses residential, commercial, industrial and retail areas and high <br />traffic roads. All projects within the public right-of-way present a traffic burden to residents and <br />businesses near the project areas. Projects near residents and business can affect normal traffic <br />flows, parking, as well as impede ingress and egress to properties. Although Contractors are required <br />to mitigate construction nuisances, it is the Construction Management Team's responsibility to <br />enforce such mitigation measures. The potential always exists for dust and fine debris to create <br />unfavorable conditions for the nearby public. Utility services may be interrupted at times during <br />construction for activities such as tie-ins, service switch-overs and startup testing. The greater the <br />inconvenience to the public, the more the public will become discontent with the projects. Minimizing <br />the burden to the public during construction is instrumental in achieving successful projects. <br />Construction Completion Time <br />In construction, time is always of the essence. Due to the magnitude and potential impacts to the <br />AKM Prop. 23-1061 11 <br />