Laserfiche WebLink
On -Call CM/I <br />AVX <br />highest quality, and is properly tested to function as intended by the design. <br />We understand that abbreviated proposals will be solicited from each selected Consultant for <br />each specific Task Order. The City has developed a very detailed typical scope of services <br />that would be requested for each Task Order which we acknowledge in its entirety. <br />LONG BEACH MUNICIPAL STORMWATER TREATMENT FACILITY (LB -MUST) <br />City of Long Beach — 411 W. Ocean Blvd., 5th Floor, Long Beach, CA 90805 <br />Contact: Mr. Colin Averill (562) 570-6679 col in.averiII(a)_longbeach. gov <br />Construction Cost: $45,000,000 A/E Fee: $2,000,000 (to date) <br />Role: Prime Construction Management / Inspection Contractor: Phase I — All American, Phase II — <br />Sully-Miller/Keller, Phase III — Shimmick Construction Co./E2 Construction <br />AKM Staff: E. Kayiran (PM); S. Patterson (CM), J. Lillengreen (CM); CJ Ervin (Inspection); M. <br />Fredriksz (Inspection); R. Bostic (Inspection); J. Huffman (Inspection); L. Harris (Inspection) <br />COMPLETE UNDER THE OMCALL SERVICES CONTRACT <br />AKM is currently providing construction management, inspection, and design quality control services <br />for the City of Long Beach Municipal Urban Stormwater Treatment (LB -MUST) Facility. The project <br />will intercept non-stormwater runoff and a percentage of the first -flush storm flows generated within <br />the City of Long Beach urban watersheds prior to discharging to existing storm drain outfalls flowing <br />into the Los Angeles (LA) River and the Los Angeles River Estuary. <br />The project is divided into three (3) phases (clearing and grubbing/ initial site preparation <br />(underground utilities and ground stabilization), treatment facility construction, and conveyance <br />system construction). <br />LB -MUST Street Improvements - AKM completed the construction management and inspection of <br />the clearing and grubbing/initial site preparation phase in 2018. This phase included clearing and <br />grubbing of the proposed site, initial rough grading of the site, removal of buried railroad tracks and <br />ties, installation of K-rail and fencing around the site, establishment of long term stormwater best <br />management practices (BMPs) for the disturbed area and weekly BMP inspections. The work also <br />required the City to relocate a homeless encampment within the work zone. In 2020, AKM completed <br />providing construction management services for Phase II of the program which included the <br />construction of a new low voltage electrical service, reconstruction and realignment of the roadway <br />fronting the proposed treatment plant site, underground utilities such as water, storm drain and <br />recycled water, as well as the installation of 3,100 linear feet of the conveyance pressure pipe system. <br />LB -MUST Ground Improvements — This phase of the project was completed in January 2021. <br />Work included furnishing all plant, labor, equipment, and materials; performing all operations as <br />required to construct the deep soil mixing (DSM) ground improvements; and providing all associated <br />testing, monitoring, sampling, and recording. Specific work included: mobilization/demobilization; <br />SWPPP; excavation and placement of 2 stockpiles; disposal of hazardous soil; surveying; Deep Soil <br />Mixing construction in full compliance with bid documents; quality control; and construction of a load <br />transfer platform <br />AKM Prop. 23-1061 14 <br />