On -Call CM/I-ri, <br />spools in the place of removed water meter and valve, installation of Owner provided 30" ball valve <br />and miscellaneous site work. <br />Problems/Issues: The major mechanical work was completed during a 14-day shutdown of the JTM <br />line which required coordination with both SCWD and Moulton Niguel Water District operations staff <br />as the JTM line is jointly owned and operated. In order for all work to be completed within the <br />shutdown duration, and to the quality standards set forth in the Contract Documents, AKM's team <br />conducted pre -shutdown field meetings and inspected all materials required for the work prior to the <br />shutdown. The work during the shutdown was completed one day earlier than anticipated. <br />The project was located within a private gated retirement community and required close coordination <br />with the property management company and community representatves. With consistent and clear <br />communication regarding the construction activities and their potential impacts, the community <br />representatives were able to properly plan and communicate with residents. As a result, the project <br />received no resident complaints. <br />LOS ANGELES "SOFI" STADIUM AND ENTERTAINMENT DISTRICT AT HOLLYWOOD PARK <br />RECLAIMED WATER PLANS PHASE 1 <br />West Basin MWD — 17140 South Avalon Boulevard, Suite 210, Carson, CA 90746 Contact: Mr. <br />Kevin Cullen (310) 217-2411 kevincCo)westbasin.org Role: Prime Construction Management / <br />Inspection Contractor: Ferreira Costal Construction Construction Cost: $10,000,000 A/E Fee: <br />$175,000 AKM Staff: E. Kayiran (PM); M Fredriksz (Inspection); F. Morales (Inspection) <br />COMPLETE UNDER THE ON'CALL SERVICES CONTRACT <br />AKM provided Construction Inspection for the project which <br />involved the construction of approximately 13,500 lineal feet of <br />8 inch to 12 inch PVC recycled water pipe. Also included were <br />valves, air/vacs and blow -offs, as well as hydr ostatic testing <br />and flushing of the completed pipeline. The pipeline serves <br />recycled water for irrigation at the new Los Angeles Rams/ Los <br />Angeles Chargers "SoFF Stadium and Entertainment District, <br />r <br />as well as filling a lake within the entertainment district. The411y <br />pipeline was constructed by Turner/AECOM, the developer of the stadium and entertainment district; <br />yet will be owned and operated by West Basin Municipal Water District. With 49 different contractors <br />working on the site each day, communication and coordination at the field level was critical to <br />maintain schedule. The work on this portion of the project started and stopped at times to <br />accommodate other work on the stadium. AKM therefore had to be extremely responsive to schedule <br />changes and restarting work on short notice. <br />CYPRESS WATER PRODUCTION FACILITY UPGRADES <br />City of Lomita — 24300 Narbonne Avenue, Lomita, CA 90717 <br />Contact: Mr. Mondher Saied, P.E., (310) 325-7110 x110 m.saied lomitacity.org <br />Construction Cost: $3,571,000 A/E Fee: $500,000 Role: Prime Construction Management / <br />Inspection Contractor: RC Foster AKM Staff: E. Kayiran (PM); R. Bostic (CM/Lead_ Insp.) <br />AKM Consulting Engineers is currently providing construction <br />management and inspection for the project which includes construction <br />of a Granular Activated Carbon (GAC) treatment facility and associated <br />ancillary equipment at the City of Lomita's Cypress Water Productions '*.. <br />Facility. The facility is currently inoperable due to high sulfides which <br />cannot be removed with the existing treatment equipment. The new GAC ` <br />system will remove sulfides to within acceptable levels. Additional work+ <br />also includes design, installation and commissioning of a security system; <br />site work (demolition, work, excavations); pipelines; canopy; electrical, controls and instrumentation; <br />startup testing, and training; potholing; a portable generator relocation; and site shoring. <br />AKM Prop. 23-1061 16 <br />