Laserfiche WebLink
F <br />�`�� GENERAL TERMS AND CONDITIONS <br />number and line number, date waste shipped, disposal and recycling facilities <br />utilized, final disposal method utilized, quantity shipped (pounds), waste profile <br />number, and any additional information requested. <br />All records and reports shall be available in electronic (including Excel, Word, and <br />PDF Format) and hard copy format at all times during the term of the contract. <br />12. TIME FOR COMPLETION OF WORK AND LIQUIDATED DAMAGES: <br />Contractor shall complete work specified herein within sixty (60) working days <br />after the commencement date stated in the Notice to Proceed. <br />The City will assess liquidated damages at the rate of $500 per calendar day that <br />the Contractor exceeds the specified date of completion. <br />City of Santa Ana IFB No. 23-117A Page 21 of 21 <br />