My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22. Monitor and enforce prevailing wage forms and requirements for conformance to the prevailing <br />wage rates on a weekly basis. Shall verify that all Trade personnel listed in the daily log are also <br />listed in the certified payroll and shall conduct weekly employee interviews, one for each trade, <br />and submit verification with the monthly progress payments. <br />23. Provide Labor Compliance monitoring. Monitor prevailing wage forms and requirements for <br />conformation to the prevailing wage rates on a weekly basis. This includes verifying that all Trade <br />personnel listed in the daily log are also listed in the certified payroll. Verification of prevailing <br />wage must be provided with the monthly progress payments. These services must be provided, so <br />the labor compliance consultant is at the discretion of the Consultant. <br />24. Shall coordinate and assist the City's Community Work Force Agreement (CWA) requirement. <br />Consultant shall monitor and enforce the CWA forms and requirements to ensure compliance. <br />Verification should be provided with the monthly progress payments. <br />25. Responsible for all project closeout items, such as: As -Built plans and related documentation, <br />punch list completion, before and after pictures, commissioning, and review, receive, and approve <br />all warrantee documents for record. <br />26. Prepare all close out documents for Caltrans Project Close Out. Organize documents in the manner <br />categories for easy search and access in the event of an audit. In the event of an audit to occur, <br />City will amend the contract to include audit support services. <br />27. Field office is to be provided by the Construction Contractor for weekly construction progress <br />meetings and any other meetings as needed. <br />28. Provide and maintain all meeting minutes and notes. <br />The city reserves the right to add or reduce some of the above tasks and duties as it sees fit. The Consultant, <br />serving as staff extension, shall remain sufficiently flexible to meet the needs of the City and of the project. <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured to <br />correspond to the above mentioned tasks as follows: <br />Task 1: Pre -construction Services <br />- Subtasks <br />Task 2: Construction Management, Inspection, and contracts administration <br />- Subtasks <br />Total Fee: <br />Fee schedule for each task should include an hourly breakdown that corresponds to the task total. <br />City of Santa Ana RFP 23-020 <br />Page Al-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.