My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS OTH ST.TO 16TH ST. ) <br />CONSTRUCTION MANAGEMENT SERVICES <br />Additional Personnel <br />The following additional personnel will participate in the Project as needed throughout all phases of the <br />Project. Senior Vice President Faisal Zahlout, is designated to act as associate in charge when project <br />manager/principal agent is unavailable. <br />Ryan Vantine, PE I Bridge Inspector <br />Ryan has over 10 years of experience in inspection/ <br />maintenance of highways, roadways, and bridges <br />throughout Southern California and is ACI certified. <br />Percentage of Time on the Project: 20% <br />RELEVANT EXPERIENCE <br />• Structure Rep/Inspector I Arroyo Seco Bridge <br />Improvements I Caltrans D7 1 $1M <br />• Structure Representative I SR 71 Improvement <br />Project I Caltrans D7 1 $174 M <br />• Asst. Structure Rep/Inspector 1 1-210 Hinge <br />Replacement Project I $1.5M <br />• Structure Rep/Inspector Emergency Repair Job <br />on SR-2 I Caltrans 1 $1M <br />• Structure Rep/Inspector Polyester Concrete <br />Overlay I San Dimas, CA 1 $1 M <br />• Clay Ave Grade Separation I RCTD 1 $17 M <br />precast girder bridge <br />Robert Bersbach, PE, QSD/QSP <br />Inspector / SWPP <br />Robert has more than 10 years of experience in <br />construction and infrastructure projects and is ACI <br />certified. <br />Percentage of Time on the Project. 100% <br />RELEVANT EXPERIENCE <br />• Asst. Resident Engineer/Lead Construction <br />Inspector I SR-210 Roadway Improvement <br />Project I Caltrans D7 I $150M <br />• Asst. Resident Engineer/Lead Construction <br />Inspector I SR-14 Improvement Project I Caltrans <br />D7 1 $1.6M <br />• Asst. Resident Engineer/Inspector 11- 5 <br />Improvement Project, Caltrans D7 I $138M <br />• Asst. Resident Engineer/Inspector I Mountain <br />Pass Bridge Replacement I Caltrans D8 1 $11 M <br />• Asst. Resident Engineer/Inspector 1 1-40 Bridge <br />Replacement, Caltrans D8 1 $35 M 1 six bridges <br />• Asst. Resident Engineer/Asst. Structure Rep/ <br />Inspector I Auto Center Drive 1 $22 M <br />SYRUSA' <br />Mohamad Alsheikh, EIT I Field <br />Inspector <br />Mohamad has experience in structure construction <br />and as an inspector working on major public works <br />projects for multiple agencies in Orange, Riverside, <br />and Merced Counties and is ACI certified. <br />Percentage of Time on the Project: 100% <br />RELEVANT EXPERIENCE <br />• Field Inspector 1 1-5 HOV Widening Project I <br />Caltrans D12 I $100M <br />• Construction Inspector SR-99 I Caltrans D59 1 <br />$18.1M <br />• Construction Inspector 1 1-405 Design -Build I <br />OCTA I $198M <br />• Field Inspector I Various Projects I City of Corona <br />I $2,5M <br />Ruth Bias, EIT I Field Inspector <br />Ruth has experience in structure construction and <br />as an inspector working on major public works <br />projects for multiple agencies in Orange, San <br />Bernardino, Riverside, and Merced Counties and is <br />ACI certified. <br />Percentage of Time on the Project: 20% <br />RELEVANT EXPERIENCE <br />• Construction Inspector I Oso/Crown Valley <br />Parkway Multiple Bridge Rehab I OCPW I $800K <br />• Roadway Inspector I SR 99 Improvement Project <br />Caltrans D59 I $18.1 M <br />• Field Engineer I 1-10 Express Lanes Design -Build <br />ISBCTAI$679M <br />PAGE IOA <br />
The URL can be used to link to this page
Your browser does not support the video tag.