My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-15 INTERCHANGE / MOJAVE RIVER BRIDGE <br />Client. Caltrans D8 <br />Role: Construction Project Manager <br />Cost: $76M <br />Duration: 03/2016 — 03/2019 <br />SYRUSA Staff on Project. Jerry De <br />Santos <br />This project widened the Mojave River Bridge and constructed <br />a new West Frontage Road Bridge over Mojave River through <br />collaboration with USACE. It also featured: <br />• Upgrading 4.1 miles of existing mainline to current standards, <br />• Improved traffic safety and operational characteristics of the <br />interchanges at "D" Street, "E" Street and Stoddard Wells Road <br />• Improved the aesthetics of the gateway to the City of Victorville <br />• Reconstructed existing "D", "E" Street and Stoddard Wall Road <br />interchange <br />• Widened Victorville Separation Overhead <br />• Constructing a new North bound (N/B) Collector Distributor <br />Bridge over "D" and "E" Streets and Burlington Northern Santa <br />Fe (BNSF) Railroad <br />• Realigned East Frontage Road, construct new West Frontage <br />Road, and added an auxiliary lane and deceleration lane. <br />• Two northbound sound walls <br />• New and replacement landscaping <br />Q Over water 15 USACE coordination <br />SR 71 FOR SEGMENT 2 AND 3 <br />Client: SANBAG <br />Role: Assistant Structure <br />Representative/Assistant Resident <br />Engineer <br />Cost: $200 Million <br />Duration: 1996-1998 <br />SYRUSA Staff on Project: Jose <br />Corona, Faisal Zahlout <br />SYRUSA's Jose Corona and Faisal Zahlout were responsible for <br />the Ramona Ave undercrossing, Soquel Canyon overcrossing <br />Segment 2, Pine Ave overcrossing, and Euclid Ave overcrossing <br />for Segment 2 and 3. Duties included monitoring falsework <br />erection, grades for the soffit and lost deck dowels, concrete <br />pour for the deck, prestressing operation, falsework removal, and <br />installation of all overhead signs and signs mounted on bridges. <br />O Environmentally sensitive area <br />SYRUSA <br />PAGE129A <br />
The URL can be used to link to this page
Your browser does not support the video tag.