Laserfiche WebLink
North East Annexation Water & Sewer Improvements <br />November 7, 2023 <br />Page 3 <br />3 <br />8 <br />1 <br />6 <br />Bid Results Summary <br />RANK BIDDER’S NAME LOCATION BASE BID <br />1 Dominguez General Engineering Inc.Pomona, CA $2,133,362 <br />2 CEM Construction Corp Montebello, CA $2,166,879 <br />3 Big Ben Inc.Irvine, CA $2,490,807 <br />4 Vasilij Inc.Irwindale, CA $2,497,508 <br />5 Ramona Inc.Arcadia, CA $2,887,829 <br />6 Colich & Sons L.P.Gardena, CA $3,356,288 <br />7 Kordich Construction Inc.Cypress, CA $3,614,148 <br />8 Mike Bubalo Construction Co., Inc.Baldwin Park, CA $4,067,887 <br />9 Griffith Company Brea, CA $4,161,671 <br />10 Excel Paving Co.Long Beach, CA $4,254,341 <br />11 SRK Engineering Escondido, CA $4,691,667 <br />Dominguez General Engineering, Inc. submitted the lowest responsive base bid, in the <br />amount of $2,133,362 (Exhibit 2). As specified in the bid documents, the lowest bid shall <br />be determined on the basis of the Base Bid. Based on the bid analysis and a <br />contractor’s reference check, staff recommends awarding the construction contract to <br />Dominguez General Engineering, Inc., in the amount of the base bid totaling $2,133,362 <br />(Exhibit 3). <br />Dominguez General Engineering, Inc. has not performed as a prime contractor in the <br />City of Santa Ana within the past five years. A reference check was made and good <br />reviews were received from other public agencies regarding quality of work performed <br />by Dominguez General Engineering, Inc. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract bid amount, the <br />estimated total project delivery cost includes construction administration, inspection, <br />and testing, along with an allowance for contingencies to account for unexpected or <br />unforeseen conditions. Construction administration and inspection includes <br />construction management and materials testing. As indicated in the Cost Analysis <br />(Exhibit 4) and as summarized in the table below, the estimated total construction <br />delivery cost of the project is $2,986,706. <br />  <br />  <br />City Council 25 – 3 11/7/2023