My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-11-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Agenda Packet_2023-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:57:23 PM
Creation date
11/15/2023 5:08:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�/J <br />City of Santa Ana <br />RFP 23-123 — On -Call Geotechnical Engineering Services <br />EOCON <br />ORGANIZATIONAL CHART OF PRIMARY STAFF <br />City of Santa Ana <br />Project Manager <br />Jelisa Thomas Adams, GE <br />Senior Engineer <br />Quality Assurance/ <br />Quality Control <br />Neal Berliner, GE <br />Key Professional Staff <br />Gerald Kasman, CEG <br />Senior Geologist <br />Petrina Zen, PE <br />Project Engineer <br />Laboratory Services <br />Phillip Stephens <br />Regional Laboratory Manager <br />Sergio Ingco <br />Laboratory Manager <br />Multi -Certified Inspectors <br />Alex Do <br />Marc J. Radlinski <br />Tyler Klingenberg <br />Razmik Davidian <br />Detailed resumes of the key personnel selected for this contract have been provided in Section C, Firm and <br />Team Experience. Resumes. The personnel listed have the necessary certifications and prior experience to <br />perform geotechnical services for the City of Santa Ana. In addition to our proposed project team, Geocon <br />has a large staff of over 275 registered engineers, geologists, certified special inspectors, and support staff <br />who are available to perform work on this project if the need for additional resources arises. <br />ANTICIPATED AVAILABILITY <br />Geocon is confident in our ability to provide geotechnical services to the City's satisfaction. We are <br />accustomed to working on multiple, large-scale concurrent projects and working on projects with tight budgets <br />and schedules. Our anticipated project availability is provided in the table below. <br />Name -1 <br />Jelisa Thomas Adams, GE <br />Role <br />Project Manager/Senior Engineer <br />Project Availability <br />25% <br />Neal Berliner, GE <br />Principal Engineer <br />35% <br />Gerald Kasman, CEG <br />Senior Geologist <br />35% <br />Petrina Zen, PE <br />Project Engineer <br />40% <br />Phillip Stephens <br />Regional Laboratory Manager <br />40% <br />Sergio Ingco <br />Laboratory Manager <br />45% <br />Alex Do <br />Inspector <br />100% <br />Marc J. Radlinski <br />Inspector <br />100% <br />Tyler Klingenberg <br />Inspector <br />100% <br />Razmik Davidian <br />Inspector <br />100% <br />City Council <br />Geocon 2023-333 <br />17 —111 <br />Page 18 <br />11 /21 /2023 <br />August 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.