My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-11-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Agenda Packet_2023-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:57:23 PM
Creation date
11/15/2023 5:08:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name, Title, and <br />Location <br />Background and Skills <br />% Time <br />Devoted to <br />Project - <br />Range Reflects <br />Various <br />Project Phases <br />Don Rankin <br />4 Electrical Engineer and experienced utility manager <br />5-10 <br />with 19 years leading Water, Wastewater and <br />Water SME <br />Stormwater Utility Operation and Maintenance, <br />Location: Topeka, KS <br />Capital Programs and Customer Service Operations. <br />• He is an innovative big picture thinker with strong <br />analytical reporting skills. <br />• Serving as a water subject matter expert for muttiple <br />advanced meter infrastructure (AMI) assessments <br />• planning and executing technology programs related <br />to AMI and meter data management systems (MDMS) <br />that meet water utility oats and objectives <br />Parvathi Murati <br />a Experience in software implementation, data <br />5-10 <br />analytics, AMI, Meter Data Management and strategy <br />MDM, IT/OT SME <br />consulting <br />Vancouver, British <br />' Involved in various UtiliWorks projects with similar <br />Columbia <br />services to what is proposed for Santa Ana, including <br />Anchorage Municipal Light and Power AK, Fort Worth <br />Water Department TX, Long Beach Gas and Oil CA <br />b. Technical Approach <br />Project Methodology <br />UtiliWorks uses a proven project methodology called UtiliWorks Advantage' for Utility Technology <br />projects, as illustrated in the proceeding page. The services requested by the City of Santa Ana's AMU <br />stakeholder committee (areas A-K in RFP) fit squarely into our service model, the UtitiWorks <br />Advantages'. The key to this successful model is that for every technology consideration there is a <br />corresponding Business Process aspect that must assessed. Each task presented in this scope of <br />services section is expected to build upon previous tasks and knowledge of the City's operations in <br />order to ensure a successful deployment process. The Feasibility Study conducted by Black Et Veatch <br />lays the foundation for the "Assess" step of AMI implementation, and the scope described herein <br />encompasses the remaining building blocks through the Install step in the UtiliWorks Advantage". <br />Additionally, the UtiliWorks Advantage' is flexible enough to provide structure to any <br />implementation the City chooses to engage in, including the "Design, Build, Run, and Transfer" <br />business model. <br />121Page <br />City Council 18 — 22 11/21/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.