My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-11-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Agenda Packet_2023-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:57:23 PM
Creation date
11/15/2023 5:08:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-AV _ VA <br />SELECT <br />CALIFORNIA <br />126 Mill Street <br />Healdsburg, CA 95448 <br />(866) 966-3376 <br />Ship To: CITY OF SANTAANA <br />220 S. DAISY AVE <br />SANTA ANA, CA 92703 <br />Bill To: CITY OF SANTAANA <br />220 S. DAISY AVE <br />SANTA ANA, CA 92703 <br />AVEVA Engineering Support <br />SCOPE <br />QUOTE 310624.2 CTYSA <br />AVEVA 3-Year CF + Support Services <br />10/16/2023 Direct Opp <br />In Process <br />Attn: James Burk <br />CITY OF SANTA ANA <br />direct (714) 647-3315 <br />fax <br />From: Brent McDowell <br />brent. mcdowell(a)cal ifornia.avevaselect.com <br />direct (707) 473-3109 <br />main (866) 966-3376 <br />fax (707) 473-3190 <br />This is a time and materials (T&M) cost proposal for the Services Team to upgrade an existing System Platform installation as well as providing <br />as -required support and assist with testing remaining sites for the City of Santa Ana. The approximate scope of work is defined below: <br />1.Upgrade the existing 2020 R2 System Platform installation to 2023 <br />a. Architecture <br />i. Two (2) partnered historians <br />ii. Galaxy Repository <br />iii. Two (2) redundant AOS <br />1. Modbus OI Server <br />2. WIN911 Alarm Notification <br />iv. Two (2) RIDS <br />b. A migration approach will be used minimizing downtime and allowing the new and old systems to run in parallel during validation. <br />c. Validation testing and startup <br />2. Assist with checkout for sites not yet tested during initial System Platform commissioning. <br />3. Provide as -needed extended support services. CoSA has recently completed equipment and control upgrades at several sites and expects to <br />complete similar upgrades at a few other sites in the future. These upgrades require significant modification of the System Platform installation. Support <br />during these upgrades is included in the extended support hours covered by this proposal. Additionally, appropriate documentation will need to be <br />developed. This includes finalizing the System Design document. <br />The extended support hours will be consumed on an as -needed basis and will be invoiced when consumed. Any hours not consumed by November <br />21st, 2026 will be lost. <br />For simplicity, a single rate will be used for all hours covered by this proposal. <br />All activity will be at the direction of James Burk, Senior Civil Engineer and XV Solutions Project Manager, Servando Varela. <br />ASSUMPTIONS <br />The following are assumptions or considerations that apply to this proposal. Deviations from these may result in schedule impact or additional costs to <br />the client. <br />1. All work to be completed remotely <br />2. The Service Team response to requests for support will be on a best -effort basis. There is no guaranteed service level or response time. <br />3. End user will be responsible for both the electrical and mechanical installation of all equipment <br />4. End user will provide any required project infrastructure not specifically provided as part of this proposal, including: <br />a. All project hardware, including servers, workstations, mobile devices, network, etc., and they shall assure that it meets required project <br />specifications <br />b. Mounting, installation, and wiring of all project hardware, and that it is operational and properly mounted, installed and wired and is ready for operatio <br />c. Server & workstation configuration including OS, network, virtualization, etc., and they shall assure that it is operational and properly configured to <br />support required network communications <br />d. Server & workstation software licensing, including OS (Windows), virtualization, database, and other system -level software <br />e. Any specific application software licensing (e.g., Aveva, Microsoft Office, Rockwell, etc.) <br />f. Will make infrastructure available for project development and testing as required <br />5. End user shall provide reliable, robust remote access to relevant systems sufficient to allow remote development, testing, & support <br />6. End user shall provide required user credentials and permissions <br />7. End user shall ensure that appropriate, qualified staff are readily available to assist with all aspects of the project's design, development, testing, and <br />deployment <br />8. End user -provided infrastructure, staff, and assets will be ready for defined onsite activities upon the Service Team's arrival onsite. Additional on -site <br />PO Number: <br />Duration: <br />Freight: <br />Terms: <br />Pages: <br />This qu@j Jj�i gjiJftg0 days. FOB: Healdsburg, CA 19 — 17 <br />Prepaid 3 d�dd <br />Net 30 Days <br />5 of 7 Remit to: 126 Mill Street, Healdsburg, CA 95448 <br />11 /21 /2023 <br />california.avevaselect.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.