Laserfiche WebLink
02 1 Scope of Services and Schedule <br />• Laboratory testing on collected construction material samples in accordance with the appropriate <br />California Test, AASHTO, and ASTM test methods and utilizing our Caltrans and AASTHO certified <br />laboratories. Laboratory testing may include maximum dry density and optimum moisture content of the <br />soils to be placed as fill or backfill; compressive strength testing of the concrete, and conformance <br />testing (including sieve analyses, sand equivalent, R-value, cleanness value and durability tests) on the <br />proposed aggregate subbase, aggregate base, asphalt concrete, and concrete pavement. Testing will <br />be performed at frequencies re-quired by the Caltrans Construction Manual and/or applicable project <br />specifications. <br />• Preparation of daily reports and other memoranda to summarize the field operations and test results. <br />Our reports will include the information required by the review agencies. <br />• Preparation of a final report summarizing the results of our field and laboratory test results, including <br />final report on grading and certification of compliance <br />Schedule <br />Ninyo & Moore is committed to providing prompt, efficient, and high quality geotechnical and materials <br />testing and inspection services throughout contract duration. As one of the largest geotechnical and geologic <br />engineering firms in southern California, Ninyo & Moore has the personnel and resources available to <br />complete the requested task order services in accordance with the City's requirements. <br />For each task order request, we will provided a detailed staffing and resources management plan which will <br />identify specific tasks and the level of effort required for the services required for the specific request. Ninyo & <br />Moore's personnel are fully committed to this contract. We also have a commitment from our subconsultant <br />team that the necessary staff will be 100% available to perform the required work at the time the task order <br />is assigned. <br />We have developed an effective on -call management system that allows us to successfully handle multiple <br />task orders concurrently. Our ability to provide consistent and cost-effective consulting services for task order <br />based contracts is a result of our many years of experience in refining our on -call management process. The <br />core of this process is our highly experienced and qualified staff of professionals that are available to begin <br />work on requested task orders. <br />Ninyo & Moore I City of Santa Ana On -Call Geotechnical Engineering RFP No. 23-123 1 PO4-04193 I August 28, 2023 10 <br />