Laserfiche WebLink
�. /fa/inya�/�►oore <br />Professional Staff <br />Principal Eng i neer/Geologist/Envi ron mental Scientist/Certified Industrial Hygienist <br />$ <br />250 <br />Senior Eng ineer/Geolog ist/Environ mental Scientist <br />$ <br />235 <br />Senior Project Eng i neer/Geologist/Envi ron mental Scientist <br />$ <br />220 <br />Project Engineer/Geologist/Environmental Scientist <br />$ <br />210 <br />Senior Staff Engineer/Geologist/Environmental Scientist <br />$ <br />200 <br />Staff Eng ineer/Geolog ist/Environ mental Scientist <br />$ <br />180 <br />GIS Analyst <br />$ <br />160 <br />Technical Illustrator/CAD Operator <br />$ <br />140 <br />Field Staff <br />Certified Asbestos/Lead Technician <br />$ 220 <br />Field Operations Manager <br />$ 150 <br />Nondestructive Examination Technician (UT, MT, LP) <br />$ 145 <br />Supervisory Technician <br />$ 140 <br />Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) <br />$ 135 <br />Senior Technician <br />$ 135 <br />Technician <br />$ 130 <br />Administrative Staff <br />Information Specialist <br />$ 120 <br />Geotechnical/Environmental/Laboratory Assistant <br />$ 120 <br />Data Processor <br />$ 95 <br />Other <br />Concrete Coring Equipment (includes technician) <br />$ <br />190/hr <br />Anchor Load Test Equipment (includes technician) <br />$ <br />190/hr <br />GPR Equipment <br />$ <br />180/hr <br />Inclinometer <br />$ <br />100/hr <br />Hand Auger Equipment <br />$ <br />80/hr <br />Rebar Locator (Pachometer) <br />$ <br />25/hr <br />Vapor Emission Kit <br />$ <br />65/kit <br />Nuclear Density Gauge <br />$ <br />12/hr <br />X-Ray Fluorescence <br />$ <br />70/hr <br />PID/FID <br />$ <br />25/hr <br />Air Sampling Pump <br />$ <br />10/hr <br />Field Vehicle <br />$ <br />15/hr <br />Expert Witness Testimony <br />$ <br />450/hr <br />Direct Expenses <br />Cost plus 15 % <br />Special equipment charges will be provided upon request. <br />For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged <br />for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the <br />regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays. <br />Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding <br />4 hours. <br />Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid <br />within 30 days. <br />Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the <br />project, as applicable. <br />The terms and conditions are included in Ninyo & Moore's Work Authorization and Agreement form. <br />Ninyo & Moore I City of Santa Ana On -Call Geotechnical Engineering RFP No. 23-123 1 PO4-04193 I August 28, 2023 CA16 <br />