Laserfiche WebLink
2 <br />0 <br />4 <br />1 <br />4 <br />Proposed Structure Improvements (“Work Plan”) <br />1607 North Freeman Street <br />Item Year Improvement <br />1 2024 Replace non-original front door and front entrance light with <br />period appropriate door and light. <br />2 2024 Replace rear, security screen door with period appropriate <br />screen door. <br />3 2024 Update bathroom with new plumbing, add light fixtures, <br />replace shower with glass shower door, and new tile. <br />4 2028 Potentially add new bathroom addition to rear <br />5 2030 Possible reroof, asses by 2025 if needed <br />6 Ongoing <br />throughout <br />duration of <br />contract <br />1. Exterior wood shingle siding maintenance/repair <br />2. Maintain original wood windows as needed <br />Exhibit D