Laserfiche WebLink
Vista Charter School Expansion Detailed Report, 7/26/2023 <br />Paving 0.00 0.00 <br />5.6.2. Construction Earthmoving Control Strategies <br />Water Exposed Area 3 <br />5.7. Construction Paving <br />General Office Building 0.00 <br />5.8. Construction Electricity Consumption and Emissions Factors <br />kWh per Year and Emission Factor (lb/MWh) <br />kWh per Year <br />• <br />2023 0.00 532 <br />2024 0.00 532 <br />5.9. Operational Mobile Sources <br />5.9.1. Unmitigated <br />General Office 84.0 <br />Building <br />5.9.2. Mitigated <br />15.5 4.90 22,962 <br />0.00 <br />74% <br />570 <br />0.03 <br />0.03 <br />WE <br />0% <br />105 <br />74% <br />wl <br />< 0.005 <br />< 0.005 <br />33.3 155,892 <br />City Council 26 — 175 1/16/2024 <br />52/63 <br />